11.07.2015 Views

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Review of Environmental Factors<strong>Glenbrook</strong> commuter car park and interchange upgrade6.12.2 Climate changeClimate change has the potential to change weather patterns. Climate change impacts are unlikely toimpact the construction or operation of the proposed commuter car park and interchange upgrade.6.12.3 SustainabilityKey sustainability considerations that have been identified are:• Reducing waste to landfill by aiming to recycle at least 90% of construction wastegenerated during site preparation and construction• Reusing 100% of useable spoil• Reduce operational energy consumption by the use of LED security lighting and the use oflighting controls to dim and switch off lights when not is use.The sustainability initiatives that are being considered <strong>for</strong> the Proposal are outlined in Appendix E.6.13 CUMULATIVE IMPACTS<strong>Transport</strong> <strong>for</strong> New South Wales is not aware of any other proposed developments in the area. It isunlikely that the Proposal would have a cumulative impact.6.14 SUMMARY OF BENEFICIAL EFFECTSAspectTraffic and accessImpactMeet commuter parking demand in the futureProvision of 56 off‐street parking spacesImproved pedestrian facilitiesProvision of three DDA spacesUpgrade to Kiss and ride facilitiesUpgrade to footpathsSocio‐economicImproved access <strong>for</strong> commutersPotential benefit to local businessesProvision of lighting and CCTV would improve safety <strong>for</strong> commutersRef No: 2260812 68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!