11.07.2015 Views

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Review of Environmental Factors<strong>Glenbrook</strong> commuter car park and interchange upgradeThe footpath on the south side of Burfitt Parade has a number of concrete segments with mosaics ofnative plants with their scientific name (refer to Figure 6‐3). The mosaics enhance the look of thefootpath. The mosaics would be removed as part of the works to upgrade the footpath.Figure 6‐3 Mosaic on the footpath on Burfitt Parade6.3.3 Mitigation measures• The Consultation Strategy would identify all potential stakeholders and the best practicemethods <strong>for</strong> consultation with these groups during construction. The plan would alsoencourage feedback and facilitate opportunities <strong>for</strong> the community and stakeholders tohave input into the project, where possible.• Contact details <strong>for</strong> a 24‐hour construction response line, project infoline and emailaddress would be provided <strong>for</strong> ongoing stakeholder contact throughout the constructionphase.• The proposed sustainability criteria <strong>for</strong> the project would encourage the contractor topurchase goods and services locally, helping to ensure the local community benefits fromthe construction of the Proposal.• Refer to Section 6.4 <strong>for</strong> noise and vibration mitigation measures <strong>for</strong> the constructionphase. A Traffic Management Plan would be developed to mitigate traffic impacts duringthe construction phase (refer to Section 6.1).• <strong>Transport</strong> <strong>for</strong> New South Wales would in<strong>for</strong>m Blue Mountains City Council and the localresidents prior to the start of any works that is likely to have an impact on local residents,commuters or local road users.• Should the way‐finding signs at the intersection of Burfitt Parade and Ross Street beremoved during construction, they would be re‐installed or replaced.• The native flower mosaics would be retained/reused in the new pavement. Should thisprove impractical, replica mosaics would be installed in the pavement.Ref No: 2260812 38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!