11.07.2015 Views

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Review of Environmental Factors<strong>Glenbrook</strong> commuter car park and interchange upgradeConstruction stagingStage 1 – enabling works to include trenching and conduits <strong>for</strong> communications cables, Optus cables andsignal cables and relocation of 11kV aerial power cables.Stage 2 – site clearance <strong>for</strong> the proposed commuter car park location and the back of footpath widening.Stage 3 – relocation of services and installation of new drainage.Stage 4 – kerb and channel works in sequence with pedestrian crossings.Stage 5 – construction of new commuter car park surfacing and line‐marking.Construction of the Proposal is expected take approximately 12 months. It is anticipated that theenabling works <strong>for</strong> the Proposal would commence in April 2013.The construction work<strong>for</strong>ce would involve approximately 10 to 15 workers at any one time on site.Construction workers would be encouraged to park on Mann Street and Burfitt Parade to the west of therailway station.A site compound would be established within the cleared area at the eastern end of the proposedcommuter car park site.The cut and fill requirement would be as follows:CutFill144m 3 (cubic metres)321m 3 (cubic metres)Construction hoursConstruction would be generally undertaken in standard hours:Monday to Friday – 7AM to 6PMSaturday‐ 8AM to 1PMSundays and Public Holidays ‐ No workHowever, some works would be required to be undertaken out of hours during rail possessions.Approval from <strong>Transport</strong> <strong>for</strong> <strong>NSW</strong> would be required <strong>for</strong> out of hours (OOHW) and the affectedcommunity would be advised as outlined in <strong>Transport</strong> <strong>for</strong> <strong>NSW</strong>’s Construction Noise Strategy (2012).Refer to Section 6.4 <strong>for</strong> further details.Ref No: 2260812 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!