11.07.2015 Views

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Review of Environmental Factors<strong>Glenbrook</strong> commuter car park and interchange upgradeThroughout the design and construction stages <strong>Transport</strong> <strong>for</strong> New South Wales consults with RailCorp onan ongoing basis.<strong>Transport</strong> <strong>for</strong> New South Wales met with the Blue Mountain City Council (BMCC) on 24 October 2012 todiscuss the Proposal and consultation would continue throughout the design and construction stages ofthe project.5.5.1 Key issues of stakeholdersIn general RailCorp supports the upgrade to the interchange facilities at <strong>Glenbrook</strong> Railway Station.RailCorp identified a number of issues that should be addressed in the Proposal design:• Maintain RailCorp vehicular access to the rail corridor from the proposed commuter carpark• Secure fencing where the proposed commuter car park is in close proximity to the stationto remove the temptation to cross the tracks• Future rail requirements e.g. track amplification• Entry and exit from the proposed commuter car park and vehicle manoeuvrability• Relocation of services.BMCC generally supports the Proposal and has provided feedback on the concept design of the Proposal.BMCC identified a number of issues to be considered in the Proposal design:• Landscaping to be in accordance BMCC’s preferred list of species• Any project components constructed on council roads to be in accordance with BMCCstandards.5.6 ONGOING OR FUTURE CONSULTATIONAt the conclusion of the public display of this <strong>REF</strong>, <strong>Transport</strong> <strong>for</strong> New South Wales would acknowledgethe receipt of feedback from each respective respondent and consider the issues raised.The Determination Report would be made available on the <strong>Transport</strong> <strong>for</strong> New South Wales website andwould include consideration of the issues addressed in the <strong>REF</strong>, consideration of issues raised in feedbackand a summary of mitigation measures and other commitments proposed to minimise the impacts of theProposal.Should <strong>Transport</strong> <strong>for</strong> New South Wales determine to proceed with the Proposal, the project team wouldkeep the community and Council in<strong>for</strong>med of the process, identify issues as they arise and developsolutions to minimise the impacts of the Proposal. The interaction with the community would beundertaken in accordance with a Community Liaison Plan (CLP) to be developed prior to construction.Ref No: 2260812 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!