11.07.2015 Views

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Review of Environmental Factors<strong>Glenbrook</strong> commuter car park and interchange upgradeNumberSafeguards and mitigation measures17 Work/site compounds would be screened, with shade cloth (or similar material) tominimise visual impacts from elevated locations.Socio‐economic18 The Consultation Strategy would identify all potential stakeholders and the bestpractice methods <strong>for</strong> consultation with these groups during construction. The planwould also encourage feedback and facilitate opportunities <strong>for</strong> the communityand stakeholders to have input into the project, where possible.19 Contact details <strong>for</strong> a 24‐hour construction response line, project infoline and emailaddress would be provided <strong>for</strong> ongoing stakeholder contact throughout theconstruction phase.20 The proposed sustainability criteria <strong>for</strong> the project would encourage thecontractor to purchase goods and services locally, helping to ensure the localcommunity benefits from the construction of the Proposal.21 <strong>Transport</strong> <strong>for</strong> New South Wales would in<strong>for</strong>m Blue Mountains City Council and thelocal residents prior to the start of any works that is likely to have an impact onlocal residents, commuters or local road users.22 Should the way‐finding signs at the intersection of Burfitt Parade and Ross Streetbe removed during construction, they would be re‐installed or replaced.23 The native flower mosaics would be retained/reused in the new pavement. Shouldthis prove impractical, replica mosaics would be installed in the pavement.Noise and vibration24 Construction noise and vibration would be managed in accordance with <strong>Transport</strong><strong>for</strong> <strong>NSW</strong> Construction Noise Strategy 2012.25 Prior to construction, a site specific Construction Noise and VibrationManagement Plan is to be prepared, consistent with the requirements of the<strong>Transport</strong> <strong>for</strong> <strong>NSW</strong> <strong>Transport</strong> Project Division’s Construction Noise Strategy andOEH’s Interim Construction Noise Guideline.26 In accordance with <strong>Transport</strong> <strong>for</strong> <strong>NSW</strong>’s Construction Noise Strategy, noisemonitoring and letter box drops at the nearest receivers (with direct line‐of‐sightto the works) is applicable <strong>for</strong> the majority of construction scenarios whenundertaken adjacent to the identified noise‐sensitive receiver locations.Ref No: 2260812 72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!