11.07.2015 Views

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Review of Environmental Factors<strong>Glenbrook</strong> commuter car park and interchange upgrade<strong>Glenbrook</strong> Railway Station and setting<strong>Glenbrook</strong> Railway Station has an island plat<strong>for</strong>m set in a rock cutting. The main station building is at thecentre of the plat<strong>for</strong>m and the lamp building is at the west end of the plat<strong>for</strong>m. The following descriptionof the main station building and other elements is summarised mostly from the SHI listing. The followingare the main elements of the station contained in the State Heritage listing:• Station building (1913)• Out of shed (c1913)• Lamp room/store (c1940)• Plat<strong>for</strong>ms (1913)• Footbridge (1916 & 1990s)• Overbridge (1912)• Moveable heritage itemso a Milners' Patent Fire Resisting safe in the ticket officeo <strong>for</strong>mer signal box 20 lever ground frame (decommissioned) in the signal boxo timber Station Master's desk in the ticket officeo signal phone and bells in the signal boxo a number of framed awards from the Railway Station Garden Competition datingfrom the 1950s to the 1990s in the signal box• Landscape setting.Condition and Integrity<strong>Glenbrook</strong> Railway Station, including the station building, out of shed, plat<strong>for</strong>ms, footbridge, gardens andoverbridge, is intact externally with minor internal modifications that do not reduce its integrity.The condition assessment of elements of the station are (Heritage Branch 2012a):• Station Building ‐ Very good condition• Out of Shed ‐ Very good condition• Lamp room/Store ‐ Moderate condition• Plat<strong>for</strong>ms ‐ Very good condition• Footbridge ‐ Good condition• Overbridge ‐ Good condition• Plat<strong>for</strong>m gardens ‐ Very good.The known modification dates include:• 31 Jul 1916: Renewal of footbridge, old footbridge transferred to Douglas Park• 23 October 1956: Line electrified• 16 Sep 1958: Single light signalling between <strong>Glenbrook</strong> and Valley Heights introduced• 1990s: Footbridge upgraded with new stairs.Although there would be no direct impact on the built environment of the station there is potential <strong>for</strong>indirect impacts on the curtilage (or boundary) of the station.Ref No: 2260812 59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!