11.07.2015 Views

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Review of Environmental Factors<strong>Glenbrook</strong> commuter car park and interchange upgradeNumberSafeguards and mitigation measures72 In the event of an incident the OEH would be notified of any incidents resulting inenvironmental harm as per Part 5.7 of the Protection of the EnvironmentOperations Act 1997.73 Construction staff would carry out visual inspections of stormwater to identify anycontamination (turbidity, hydrocarbon spills).74 All fuels and other chemicals would be stored in a bunded area.75 Refuelling of vehicles would only be carried out in an impervious area to preventany spills from entering a waterway.76 A gross pollutant trap would be installed to remove pollutants from stormwaterbe<strong>for</strong>e it leaves the site.77 On‐site stormwater detention would be installed in the proposed commuter carpark.78 Any vehicle wash down or concrete wash out would be carried out in a bundedarea in accordance with OEH’s guidelines <strong>for</strong> concrete washouts.Light spill79 In the detailed design phase, a lighting plan would be developed to minimise lightspill from the proposed commuter car park.80 Lighting would be installed to Australian standards.7.3 LICENSING AND APPROVALS<strong>Transport</strong> <strong>for</strong> New South Wales does not require any licences or approvals to construct the Proposal.Ref No: 2260812 78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!