12.07.2015 Views

31 July 2011 C1 CIVIL AVIATION DEPARTMENT HONG KONG ...

31 July 2011 C1 CIVIL AVIATION DEPARTMENT HONG KONG ...

31 July 2011 C1 CIVIL AVIATION DEPARTMENT HONG KONG ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(d)(e)(f)(g)(h)Identify any features that are believed to require new or amendedscheduled maintenance tasks and participate in the scheduledmaintenance task analyses. (See Appendix No. 1 for guidance.)Ensure that all appropriate airworthiness/operational data is producedin sufficient time for the operator to incorporate into relevant manualsprior to entry into service. This should include normal, abnormal andemergency procedures.IFE installations (equipment or wiring) may affect existing TC/STCHolder derived maintenance tasks. The designer should assess, inaccordance with original scheduled AMS development processes, theeffect of the modification on the existing maintenance tasks andinspections, and address accordingly.Validated maintenance instructions to be produced so that the originalinstallation standards are maintained after in-service activities.Establishment of engineering liaison processes to address minorchange requests required during installation, and to monitor and reactto operator in-service reliability feedback.5.6 Considerations for InstallerThe installer of an IFE system should manage, as a minimum, compliancewith the following:(a)(b)(c)(d)Establish communication links with the project manager and therelevant stakeholders.A verified internal competence and capability assessment should becarried out against the specific installation requirements. This shouldcover, as a minimum, any necessary unique skills, technologies, toolsand training. Installer's competence/scope should be described withinthe HKAR-145 Maintenance Organisation Exposition (MOE).The pre-planning function should seek to identify any shortcomingswithin the installation instructions prior to installation on the aircraft,and to report to the relevant stakeholders for resolution.Provide feedback and gain approval of minor installation andinstruction/drawing changes found during installation.5.7 Considerations for OperatorThe operator of an aircraft installed with an IFE system should manage, as aAN-65 P.5<strong>31</strong> January 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!