13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Guidelines for preparation <strong>of</strong> reports Under NRCP / NGRBAb) Check list <strong>of</strong> Feasibility Report <strong>of</strong> Sewerage SchemesS. No. Parameters Yes No1. Has the CSP been approved?2. Has the problem <strong>of</strong> pollution with its causes been identified ?3. Has the expected outcome been spelt out ?4. Has all available data relating to the city being necessary for FRand indicated in the Guidelines been collected?5. Have maps <strong>of</strong> the city been prepared?6. Has the present system <strong>of</strong> management <strong>of</strong> waste water andother works been studied ?7. Have areas requiring upgradation <strong>of</strong> existing system <strong>of</strong> wastewater management been identified?8. Have areas where sewers to be laid been identified?9. Have drainage areas and sewage districts been identified?10. Have alternative systems <strong>of</strong> waste water management beenworked out?11. Has feasibility <strong>of</strong> options been worked out?12. Has life cycle costs <strong>of</strong> options been worked out?13. Have alternative options been evaluated and the most costeffective and sustainable option selected?14. Has land requirement and its availability been examined?15. Has executive summary been prepared?16. Executive Summary attachedc) Checklist for DPRs <strong>of</strong> Community Toilet ComplexesS. No. Parameters Yes( )1 Approval <strong>of</strong> CSP by MoEF2 Executive Summary3 Monitoring <strong>of</strong> DPR preparation at higher levels4 Preparation <strong>of</strong> digitised map giving location <strong>of</strong> CTCs5 Baseline data and current status <strong>of</strong> utilisation <strong>of</strong> existing CTCs6 Consultations with stakeholders to identify CTC locations7 Availability <strong>of</strong> land for such locations8 Selection <strong>of</strong> agency for pay-and-use operation9 Confirmation <strong>of</strong> State Government/local body to share 30% cost10 Programme <strong>of</strong> public education and awareness11 Use <strong>of</strong> latest SoRs for preparation <strong>of</strong> cost estimates12 Justification <strong>of</strong> cost estimate13 Proposal for performance monitoring14 Completion scheduleNo(x)103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!