13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 5DETAILED PROJECT REPORTSOF SEWERAGE SCHEMES5.1 GENERALThe Feasibility Report would have selected the most suitable system for pollution abatement.Design <strong>of</strong> the selected system and its components should be done following these guidelines.NGRBA guidelines provide for the River Ganga basin, that apart from conveying sewers,pumping stations and STPs, these items should also be included in projects in unsewered areasto make the city fully sewered. Under NRCP also, branch and lateral sewers and houseconnections up to the property land are to be proposed to ensure comprehensive coverage.DPR shall be prepared on the basis <strong>of</strong> detailed survey, investigation & engineering design.Designs <strong>of</strong> all these facilities should be based on standard procedures laid down in CPHEEOmanual (http://urbanindia.nic.in/publicinfo/manual.htm). In the event <strong>of</strong> absence <strong>of</strong> guidelinein the manual on a particular aspect, BIS codes, standard books, state / CPWD manuals may befollowedSelection <strong>of</strong> pipe materials like GRP / DI etc shall be as per site conditions. Basis for selection <strong>of</strong>gravity sewer/rising main shall be provided in the DPR.Existing sewerage works should be dovetailed with the proposed scheme.Provision <strong>of</strong> dedicated feeders for SPS and STPs is essential to ensure round the clock operation.The DPR should contain details <strong>of</strong> such feeders like length <strong>of</strong> the cable from the power source,specifications <strong>of</strong> transformers and estimated cost. NRCD would not consider funding proposalswhich do not comply with this requirement.5.2 Improving an Existing SystemIf a decision is taken to improve an existing system <strong>of</strong> waste water management by repairing,refurbishing, upgrading and / or modernizing, the items <strong>of</strong> work that are needed should beidentified and the details worked out and costs estimated.5.3 Design Parameters Covered in Chapter on Feasibility ReportDetails <strong>of</strong> the following items have been given in Chapter on “Preparation <strong>of</strong> Feasibility Report<strong>of</strong> Sewerage Schemes” and, therefore, are not being repeated here:i. Design Periodsii. Future Population & Population Projectionsiii. Sewerage Master Planning / Zoningiv. Rate Of Water Supplyv. Status Of Existing Water Supplyvi. Per Capita Sewage Flowvii.viii.Ground Water InfiltrationRiver Water Qualitya) Water Quality Standards For Rivers42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!