13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Guidelines for preparation <strong>of</strong> reports Under NRCP / NGRBAb) Actual Water Quality Of The River5.4 QUANTITY OF WASTE WATERFor sewers, a 30-year design perspective is proposed. Actual flows measured through fieldinvestigations should be projected for this period. Similarly for STPs and pumping stations,flows should be projected taking into consideration population <strong>of</strong> the respective design period.The figure arrived at, following the method given in paragraph 4.9, should be adopted if there isdiscrepancy between the two projections.There should be permanent arrangement for measuring discharge in drains.5.5 SEWAGE QUALITY FOR STP DESIGNPast experience indicates that normative values <strong>of</strong> parameters like BOD and SS have been takenfor influent sewage despite actual quality characteristics having been established through fieldinvestigations. Such considerations result in over design <strong>of</strong> STPs with higher cost implications.This must be avoided and actual influent quality with an appropriate mark up only beconsidered for design purposes. For adopting BOD levels above 150 mg/l, proper justificationmust be provided.Parameters for the quality <strong>of</strong> wastewater (Values <strong>of</strong> BOD and SS) shall be adopted on the basis<strong>of</strong> actual quality <strong>of</strong> wastewater incoming at STPs / sewage pumping stations under O&M in thetown / other towns in the vicinity, under similar situation. Such laboratory reports shall formpart <strong>of</strong> DPR.5.6 SEWERSLayouts <strong>of</strong> sewerage mains or sub-mains should be prepared maintaining minimum depths andshortest flow distances with laterals proposed in the DPRs. Gravity flows must be preferred overpumping mains as far as possible to minimize pumping costs.a) Sewers shall be designed crown meeting crown. Drops shall be avoided at junction points.b) The plans should show basic details such as GLs, contours, major drains, their points <strong>of</strong>outfall, diameter and invert levels <strong>of</strong> sewers provided, specially at junction points.c) Layout <strong>of</strong> trunk sewer should be properly highlighted and be shown bold on the plans andthe design chart.d) Type <strong>of</strong> subsoil strata up to sewer invert level, subsoil water table data and type <strong>of</strong> roadsurface over the proposed sewer alignments shall be mentioned in the L-section <strong>of</strong> theproposed sewer.e) Wherever it is not possible to generate self-cleansing velocity, flushing <strong>of</strong> sewer linesshould be carried out at regular intervals. The requirement and number <strong>of</strong> flushing vansavailable with the O&M agency may be reviewed and provision for the same, if required,may be made in the estimate to be submitted.f) Suitable bedding should be provided below sewers to safeguard them against possiblesettlement, as per the guide lines suggested in the Manual on Sewerage & SewageTreatment <strong>of</strong> CPHEEO.g) Soil investigation and test bores should be carried out at suitable intervals along the43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!