13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter - 5 Detailed Project Reports <strong>of</strong> Sewerage Schemesalignment <strong>of</strong> sewers to ascertain the type <strong>of</strong> soil at different depths and behaviour <strong>of</strong> theground water table and bearing capacity <strong>of</strong> the soil. The design <strong>of</strong> bedding may be donebased on actual ground conditions.h) Minimum depth <strong>of</strong> buried sewer shall be designed considering future rolling / point loadson city roads.i) Where sewers are proposed to be laid below sub-soil water table, justification for thesame and the precautionary measures to be taken during laying <strong>of</strong> sewers shall bementioned in the DPR.j) In case proposed sewer/rising main is crossing railway line/Highway and their bridges,copies <strong>of</strong> their permission and estimates for the same shall be annexed with the DPR.k) A plan <strong>of</strong> action for giving sewer connections year wise during the implementation period<strong>of</strong> the work shall be prepared and a suitable provision be made in the byelaws to enforcecompulsory sewer connections and user charges on the beneficiaries. The DPR may beprepared to achieve 100 % house connections for the present population within theproject implementation period. This is necessary to assure flows in the sewer networkand optimum utilisation <strong>of</strong> STP capacity.l) Provision may be made in the DPR for house connections from the property lines up to thesewers including cutting and reinstatement <strong>of</strong> roads. This will also eliminate cutting <strong>of</strong>roads from time to time.m) Suitable sewage cess / tariff / tax and sewer connection fee may be imposed on thebeneficiaries to recover at least the O&M cost <strong>of</strong> the project to start with. However, fullcost recovery at the earliest should be aimed at. ULBs may consider suitable incentiveprograms to encourage people to opt for sewer connection, e.g. property tax rebate for'one-time' sewer connection by individuals. Besides, non-willing households, particularlyhaving septic tank facilities may be penalized for discharging septic tank effluents in opendrains / not constructing soak pit at prescribed distance from water source, water supplypipelines etc.n) Design criteria as stipulated in CPHEEO Manual (http://urbanindia.nic.in/publicinfo/manual.htm) may be followed.5.7 SEWAGE PUMPING STATIONSDesign <strong>of</strong> pumping stations should take into consideration the lean, average and peak flows.Pumping configuration should be appropriate for effective pumping <strong>of</strong> sewage in any <strong>of</strong> theseflow conditions.Submersible sewage pumps are now available and being extensively used, which are moreeconomic in terms <strong>of</strong> both capital and running cost besides being operation friendly.The following configuration <strong>of</strong> sewage pumps may be adopted:44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!