annexures - Indian Institute of Technology Roorkee
annexures - Indian Institute of Technology Roorkee
annexures - Indian Institute of Technology Roorkee
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter - 8 Crematoria(i)(j)(k)Toilets, washrooms and source <strong>of</strong> drinking water should be <strong>of</strong> matching requirement.Similarly adequate lighting arrangements should be provided.Provision <strong>of</strong> minimum landscaping equivalent to 5 % <strong>of</strong> the cost <strong>of</strong> civil work (maximum)with greenery and flowerbeds etc should be provided. This is necessary for improving theaesthetics and providing soothing environment for the mourners.Estimates <strong>of</strong> civil work should be based on the latest SOR applicable for the city. Estimates<strong>of</strong> non-schedule items should be based on lowest <strong>of</strong> the three quotations obtained fromprospective suppliers.8.5.2 Proposal for Up gradation <strong>of</strong> Existing Cremation Ground(a)(b)For upgradation proposals, generally pyres, trays, hood and chimneys with appurtenantcivil work may be considered.For inclusion <strong>of</strong> additional items, if any, referred to for the new cremation grounds properjustification should be provided.8.6 LANDSCAPING AND ARCHITECTUREConsidering the sensitivity <strong>of</strong> the site, attempt should be made to develop the premises withcompatible landscaping and architecture for better environment and aesthetics.8.7 OPERATION AND MAINTENANCECharges are levied on use <strong>of</strong> crematoria. An estimate should be made and incorporated in theproject cost.All projects should have built-in components <strong>of</strong> 5 years O&M.8.8 COST ESTIMATEThe equipment for electrical and gas based crematoria is supplied on a turnkey basis.Quotations from the suppliers should be obtained alongwith the requirements <strong>of</strong> land, civil,electrical and mechanical works. Based on this information cost estimates should be preparedand presented in the form given in the table below.Table 8.1: Cost Estimate <strong>of</strong> CrematoriaS. Name <strong>of</strong> Details <strong>of</strong> Item Quantity Cost/unit, Rs. Total Cost, lacsNo. Locality1. Wood based crematoria2. Electrical crematoria3. Gas based crematoria4 Land acquisition costO&M CostGrand Total70