13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter - 8 Crematoria(i)(j)(k)Toilets, washrooms and source <strong>of</strong> drinking water should be <strong>of</strong> matching requirement.Similarly adequate lighting arrangements should be provided.Provision <strong>of</strong> minimum landscaping equivalent to 5 % <strong>of</strong> the cost <strong>of</strong> civil work (maximum)with greenery and flowerbeds etc should be provided. This is necessary for improving theaesthetics and providing soothing environment for the mourners.Estimates <strong>of</strong> civil work should be based on the latest SOR applicable for the city. Estimates<strong>of</strong> non-schedule items should be based on lowest <strong>of</strong> the three quotations obtained fromprospective suppliers.8.5.2 Proposal for Up gradation <strong>of</strong> Existing Cremation Ground(a)(b)For upgradation proposals, generally pyres, trays, hood and chimneys with appurtenantcivil work may be considered.For inclusion <strong>of</strong> additional items, if any, referred to for the new cremation grounds properjustification should be provided.8.6 LANDSCAPING AND ARCHITECTUREConsidering the sensitivity <strong>of</strong> the site, attempt should be made to develop the premises withcompatible landscaping and architecture for better environment and aesthetics.8.7 OPERATION AND MAINTENANCECharges are levied on use <strong>of</strong> crematoria. An estimate should be made and incorporated in theproject cost.All projects should have built-in components <strong>of</strong> 5 years O&M.8.8 COST ESTIMATEThe equipment for electrical and gas based crematoria is supplied on a turnkey basis.Quotations from the suppliers should be obtained alongwith the requirements <strong>of</strong> land, civil,electrical and mechanical works. Based on this information cost estimates should be preparedand presented in the form given in the table below.Table 8.1: Cost Estimate <strong>of</strong> CrematoriaS. Name <strong>of</strong> Details <strong>of</strong> Item Quantity Cost/unit, Rs. Total Cost, lacsNo. Locality1. Wood based crematoria2. Electrical crematoria3. Gas based crematoria4 Land acquisition costO&M CostGrand Total70

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!