Guidelines for preparation <strong>of</strong> reports Under NRCP / NGRBAFREQUENCY OF REVIEW VISITSThe required frequency <strong>of</strong> reviews by TPIs is mentioned below, and shall vary based on therequirements <strong>of</strong> specific project. Review visits at a frequency higher than that mentioned below, shallonly be undertaken at the express request by either the State Nodal Department or NRCD, MoEF. Thetable below provides an indication <strong>of</strong> the effort estimate required from the TPI.S. Nature <strong>of</strong> review Timing Method <strong>of</strong> review FrequencyNoPre-Construction Stage1. Review <strong>of</strong> projectdesign documentOn completion <strong>of</strong> design <strong>of</strong>project/ project component Design documentsand drawings2. Review <strong>of</strong> bid Review <strong>of</strong> documentation Pro<strong>of</strong> <strong>of</strong>documentation prior to NITAdvertisement,and bid process Review <strong>of</strong> bid process letters, andthrough its durationcorrespondence Bid Documents,Contractagreements3. Review <strong>of</strong> site Prior to start <strong>of</strong> construction Inter departmentalpreparation andcorrespondencesclearances to Official recordsbeginconstruction4. Review <strong>of</strong> Project After deployment <strong>of</strong> Project As per <strong>of</strong>ficialManagement Management SystemsrecordsSystems Observations Discussions withPEAConstruction Stage & Commissioning, Trial-Runs and Testing Stage5. Report on• After handing over the site to Reports andPhysical progress contractor/ concessionaire, and documents<strong>of</strong> project regularly over the Construction submitted by PIUperiod Review <strong>of</strong>6. Report on qualityassurance systemmilestones as perContractagreement Discussions withPEA Request forinspection (RFI)reports Contractagreement andphysicalobservation Discussions withPEAOnceOnceOnceMonthly /Quarterly*Monthly /Quarterly*131

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!