13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Guidelines for preparation <strong>of</strong> reports Under NRCP / NGRBACITY LEVEL1. Preparation <strong>of</strong> Comprehensive Sewage Disposal PlanPlease provide the timeline for preparing this Comprehensive Plan for the cityYear 1 Year 2 Year 3 Year 42. Sewerage Network Increase in the Sewerage network <strong>of</strong> the cityYear 1 Year 2 Year 3 Year 4Construction <strong>of</strong> Sewage Treatment Plants to treat the captured sewageYear 1 Year 2 Year 3 Year 4Laying <strong>of</strong> trunk & intercepting sewers for diversion <strong>of</strong> sewage out falling into the riverYear 1 Year 2 Year 3 Year 4Power connection to Sewage Treatment Plants and Pumping StationsYear 1 Year 2 Year 3 Year 4Obtain yearly consent to operate the STP from the concerned State Pollution ControlBoards/Committees3. Storm Water Drainage (Flowing into the river) Identification <strong>of</strong> Problem AreasYear 1 Year 2 Year 3 Year 4Primary Drain Rehabilitation and Improvement ProgramYear 1 Year 2 Year 3 Year 4Monitoring <strong>of</strong> water quality parameter (in the Drains at confluence with riverYear 1 Year 2 Year 3 Year 44. Non point sources <strong>of</strong> pollution Providing electric / improved wood based crematoria to minimize the river pollution onaccount <strong>of</strong> disposal <strong>of</strong> unburnt dead bodies.Year 1 Year 2 Year 3 Year 4123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!