13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter - 8 Crematoria8.4 FIELD INVESTIGATIONSThe proposal may comprise either new facility or upgradation <strong>of</strong> existing facility or acombination <strong>of</strong> both.8.5 DESIGN AND OTHER CONSIDERATIONS(A)Projects <strong>of</strong> electric/gas based crematoria should have the following components:Electric(a) Furnace(i) Furnace with appurtenant components with specifications as given below.(ii) The number <strong>of</strong> furnaces should be decided on the basis <strong>of</strong> expected cremation loadassessed through field investigations. Furnace having power rating <strong>of</strong> 51 KW Transformer-150 KVA LT Panel, HT switchgear, Heating elements Chimney – 30 m long as per norms <strong>of</strong> SPCB/CPCB Blower <strong>of</strong> 2800 rpm and 10 HP motor for flue gases Fresh air blower with servo motors Door motor for door lifting Charging trolley Pollution control equipment for cleaning flue gases like cyclone separator, waterspray tank and slurry tank(b) Building(i) Provision <strong>of</strong> a proper sized building should be made for housing cremation furnaceincluding sitting space for mourners, toilets, washrooms, drinking water etc.(ii) Even if only one furnace is proposed, provision <strong>of</strong> building should be made for tw<strong>of</strong>urnaces keeping in view the future load.(iii) The optimum size for housing two furnaces and other facilities is 30 m x 20 m(B)Gas(a)FurnaceGas based crematoria may be operated on either CNG or LPG. Gas furnace with appurtenantcomponents should have the following specifications.Like electric crematoria, the number <strong>of</strong> furnaces should be decided on the basis <strong>of</strong> expectedcremation load assessed through field investigations.Furnace: With necessary burners generally four burners are provided in each furnaceFuel:CNG or LPGIgnition: Direct spark ignition 7300-volt ignition transformerMotor:3450-220 V-2.4 ABlower: 2800 rpm and 10 HP motor for flue gasesChimney: 30 m long as per norms <strong>of</strong> SPCB/CPCB68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!