13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Guidelines for preparation <strong>of</strong> reports Under NRCP / NGRBA<strong>of</strong> intermediate pumping stations. These require power and since in most states there isshortage <strong>of</strong> power, standby arrangements in the form <strong>of</strong> DG sets have to be provided for.Thus centralised system involves high capital cost and high O&M cost.iv. There are pros and cons <strong>of</strong> centralised and decentralised systems. They should becarefully analysed and compared. Life cycle costs <strong>of</strong> different systems should becompared.v. The capacity <strong>of</strong> the ULB – financial, material, human resource related to implement,operate and maintain and manage the pollution abatementvi. The ability and willingness <strong>of</strong> the people to meet their obligations to sustain the systemetc.vii. Over the life cycle <strong>of</strong> the system, the net present value <strong>of</strong> annual costs should be workedout <strong>of</strong> systems that are considered feasible and on that basis the system found to cost theleast should be selected.Based on the above factors the most suitable system may be selected.4.20 PREPARING DRAWINGSDrawings <strong>of</strong> works proposed should be incorporated in the feasibility report.41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!