13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annexure - 11ChaptersDescription1.7 River water qualityWater quality <strong>of</strong> the river u/s, d/s and at outfalls <strong>of</strong> drains discharging into the riverDetails <strong>of</strong> measurement <strong>of</strong> the quality <strong>of</strong> river water along with copies <strong>of</strong> test reportsMethodology followed for flow measurement and quality characteristicsWater quality standards <strong>of</strong> river water quality1.8 Justification <strong>of</strong> the project for pollution abatement <strong>of</strong> the river2 APPROACH and status <strong>of</strong> existing works2.1 Description <strong>of</strong> sewerage districts2.2 Design ConsiderationsDesign periods <strong>of</strong> various componentsNorms for rate <strong>of</strong> water supply2.3 Population within the project areaCensus population <strong>of</strong> the last 5 decadesDetails <strong>of</strong> future population projections as per the City Master PlanPopulation Projections <strong>of</strong> each district in design years2.4 Water SupplyActual Water supply from different sources ward wise, Population covered and rate <strong>of</strong> watersupplied in different areasProposals for augmentation <strong>of</strong> water supply systemRate <strong>of</strong> water supply in each district2.5 Sewage GenerationInterception FactorSewage Generation in each district in design years as per norms <strong>of</strong> rate <strong>of</strong> water supplySewage Generation in each district in design years as per projected actual flows in drainsSewage Generation in each district in design years as adopted2.6 Status <strong>of</strong> existing waste water disposal worksExisting worksWorks under executionWorks sanctioned but not yet startedDetails <strong>of</strong> proposed renovation, up gradation, augmentation etc <strong>of</strong> the existing sewerage works3 Design Details <strong>of</strong> proposed works3.1 Design CriteriaDesign periods <strong>of</strong> various componentsNorms for rate <strong>of</strong> water supply32 Sewer networkHydraulic Design <strong>of</strong> Sewer Network, District wiseDesign <strong>of</strong> sewer Bedding158

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!