13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER 2COLLECTION OF DATA2.1 INTRODUCTIONAs stated in Introduction, preparation <strong>of</strong> Detailed Project Report for pollution abatement is athree step process, namely, City Sanitation Plan (CSP), Feasibility Report (FR), followed by theDetailed Project Report (DPR). This chapter deals with collection <strong>of</strong> data required for preparingall these reports. Some states have already started preparing CSPs. Where available, these CSPsshould be used. If necessary, they may be updated and if there are any gaps in relation to theriver pollution abatement works, these should be filled up.Preparation <strong>of</strong> CSP is to precede the FR and is to be the basis for preparing the DPR. It follows,therefore, that it should be prepared on the basis <strong>of</strong> available data (Primary / Secondary Data)that has been generated by the concerned agencies and primary data may also be required.Feasibility Report will identify the problem <strong>of</strong> pollution, develop and evaluate the variousoptions and select the best that is cost effective and sustainable and produces the intendedoutcome.After selection <strong>of</strong> a city on the basis <strong>of</strong> data collection, it is necessary to prepare a CSP, FR <strong>of</strong>sewerage schemes and then a DPR. The DPRs <strong>of</strong> non-sewerage schemes can be preparedstraight after the preparation <strong>of</strong> CSP. For preparing the DPR, additional data may be needed,which may have to be generated by undertaking suitable survey and investigation (primarydata).In this chapter, the guidelines deal with collection <strong>of</strong> primary and secondary data.2.2 DATA REQUIRED AT DIFFERENT LEVELSThe data needs to be gathered at several levels as below:i. Drainage basin <strong>of</strong> the river, in which polluted stretches have been identified and in respect<strong>of</strong> which the pollution abatement project is to be prepared. This will help to identify thepriority for taking up pollution abatement works to improve the river water quality.ii. The town which is causing pollution <strong>of</strong> the river and for which an integrated project is to beprepared for abatement <strong>of</strong> pollution from waste water and solid waste. A town may haveto be divided into a number <strong>of</strong> sewerage districts for getting optimal results and datagathered should meet this need. In case some data mentioned below is not available, itmay be stated at the appropriate place. However, DPR should integrate all the dataprovided by agencies concerned for pollution abatement.2.3 DATA RELATED TO DRAINAGE BASINIt is beneficial for the planner to have an understanding <strong>of</strong> the river basin as every activityundertaken at any point in the basin has implications for the river as a whole, though more<strong>of</strong>ten on the downstream side. It is, therefore, necessary to identify activities and their impacton the river. Relevant data must be collected and analysed so as to assign priority to towns fortaking up pollution abatement works. Data that needs to be collected is mentioned below.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!