13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNEXURE-9SUGGESTIVE STRUCTURE OF THE CITY SANITATION PLAN REPORTChapters(i)(ii)(iii)(iv)DescriptionTable <strong>of</strong> ContentsList <strong>of</strong> AbbreviationsSALIENT FEATURES OF THE PROJECTEXECUTIVE SUMMARY1. ABOUT THE PROJECT AREA1.1 Authority for preparation <strong>of</strong> project1.2 Composition <strong>of</strong> the team set up for preparing the City Sanitation plan1.3 Description <strong>of</strong> the project areai. Brief description <strong>of</strong> the polluted stretch <strong>of</strong> the river and its basinii. Justification for selecting the town for project formulation under NRCP / NGRBAiii. Brief history <strong>of</strong> the towniv. Geographical Locationv. Climatevi. Topographyvii. Drainage channelsviii. Administrative divisionsix. Commercial aspectsx. Industrial activitiesxi. Educational activitiesxii. Cultural activitiesxiii. Religious activitiesxiv. Socio –Economic statusxv. Town Managementxvi. Land cost in and around the town (copy <strong>of</strong> rates be attached in support)xvii. City Development plan, if any, covering the sewerage and non sewerage aspects.1.4 Population within the project areai. Ward wise Census population <strong>of</strong> the last 5 decades, area, no. <strong>of</strong> households, growthrate, density <strong>of</strong> populationii. Slum wise population <strong>of</strong> the last 5 decadesiii. Details <strong>of</strong> future population projections as per the City Master Planiv. Cattle population2. SEWERAGE WORKS2.1 Status <strong>of</strong> water supplyi. Actual Water supply from different sources ward wise, Population covered and rate <strong>of</strong>water supplied in different areasii. Proposals for augmentation <strong>of</strong> water supply system2.2 Status <strong>of</strong> existing waste water disposal worksi. Existing worksii. Works under executioniii. Works sanctioned but not yet startediv. Total waste water generationv. Industrial flow150

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!