13.07.2015 Views

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

annexures - Indian Institute of Technology Roorkee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter - 10 Solid Waste Management Preparation <strong>of</strong> Feasibility Report10.8 WASTE CHARACTERISTICSFor preparing the DPR the physical and chemical characteristics <strong>of</strong> waste need to bedetermined after testing. Such laboratory reports shall form part <strong>of</strong> the DPR. For preparing FR,the average values may be adopted based on results <strong>of</strong> the testing done in other cities <strong>of</strong> theState. The parameters on which data may be obtained are as follows:10.8.1 Physical Characteristicsa) Per capita solid waste generationb) Biodegradable quantity <strong>of</strong> wastec) Non-biodegradable quantity <strong>of</strong> wasted) Moisture content (% by weight)e) Average ash content andf) Calorific value <strong>of</strong> wasteg) Quantity and type <strong>of</strong> recyclable wasteh) Density (Kg/M3) & composition <strong>of</strong> waste10.8.2 Chemical Characteristicsa) Organic matter (%)b) NPK values (%)c) C/N ratiod) Calorific value (Kcal/Kg)Chemical characteristics <strong>of</strong> MSW may be given in a table as annexure <strong>of</strong> the DPR.10.9 SYSTEM DESIGN OF SOLID WASTE MANAGEMENT10.9.1 ApproachThe approach to solid waste management focuses on:i. Segregation <strong>of</strong> waste at source into biodegradable, non-biodegradable waste categoriesii. Appropriate waste collection (both door to door & community bin system) and storageiii. Primary and cecondary transport <strong>of</strong> the waste to transfer stations (TS) and or disposalsite.iv. Processing and treatment <strong>of</strong> the MSW for recovery <strong>of</strong> material & energy.v. Minimizing the waste to be disposed through sanitary land filling.vi. Public – Private partnership for economic sustainability and proper handling andmanagement <strong>of</strong> waste.vii. Decentralized / centralized processing <strong>of</strong> biodegradable waste to compost to utilize itsnutrient valueviii. Revenue earning from recyclable / reusable waste with the involvement <strong>of</strong> scvengers(above the age <strong>of</strong> 18 years), NGOs / CBOs:ix. The management <strong>of</strong> SWM can be divided into four functional units Segregation at source, collection and storage at source Transfer and transport Processing and treatment76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!