13.07.2015 Views

MAINTAINABILITY DESIGN TECHNIQUES METRIC - AcqNotes.com

MAINTAINABILITY DESIGN TECHNIQUES METRIC - AcqNotes.com

MAINTAINABILITY DESIGN TECHNIQUES METRIC - AcqNotes.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Downloaded from http://www.everyspec.<strong>com</strong> on 2011-10-29T14:56:01.DOD-HDBK-791(AM)constitute an extra maintenance burden on the system. Itis not necessary to specify a $2000 oscilloscope to measurea ± 5V on a digital circuit.3-6.10.2 AR 750-43, Test, Measurement, andDiagnostic EquipmentTo bring order out of chaos, AR 750-43 was published.This Army Regulation (AR) (Ref. 22) prescribes policies,establishes objectives, and priorities, and assigns responsibilitiesfor the life cycle management of TMDE. It alignswith directives and instructions developed and publishedby the Maintenance Policy Directorate, office of theAssistant Secretary of Defense for Manpower. ReserveAffairs, and Logistics. Primary DoD publications thatapply to the contained policies are DoD Instruction No.4100.40 and DoD Directive No. 4151.16. AR 750-43 alsonames the Commanding General, US Army MaterielCommand (AMC), as the Department of the Army ExecutiveDirector for TMDE (EDT) responsible for developingand re<strong>com</strong>mending TMDE policy to Headquarters.Department of the Army—i.e., the central managementof all TMDE support to ensure peacetime readiness whileproviding a smooth transition to wartime support. Theprocedure by which AMC executes this TMDE responsibilityis described in par. 3-6.10.3.3-6.10.4 DA TMDE Preferred Items List (PIL_3-6.10.3 AMC’s Role as Executive DirectorAMC, through the US Army TMDE Support Group(USATSG), places the TMDE calibration and repairunder a central manager. The TMDE support missionsand resources of all Army major <strong>com</strong>mands, except theSurgeon General, are under the control of the USATSG.A major benefit of this central management has been theability to <strong>com</strong>pile and assess detailed requirements andperformance data and to apply these data on a timelybasis to manage resources. This has led to optimum use of3-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!