12.02.2016 Views

Third IMO Greenhouse Gas Study 2014

GHG3%20Executive%20Summary%20and%20Report

GHG3%20Executive%20Summary%20and%20Report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex 3 203<br />

Figure 16: Plots of difference in fraction of time spent at sea for all ships, with increasing<br />

high-confidence AIS count over the year. For each ship in one of these 5%-wide bins,<br />

the difference between fraction of time at sea between AIS and LRIT is calculated.<br />

The mean of this difference per bin is plotted in red, and the standard deviation<br />

of the difference in each bin is plotted in blue<br />

Speed is also compared from AIS-derived estimates to the LRIT estimates. During the processing and<br />

extrapolating from AIS data, the AIS data are resampled to hourly bins. This introduces uncertainty into the<br />

estimate of the speed of the ship, as the ship speed is not constant throughout the hour. To highlight this<br />

uncertainty, Figure 17 shows the distribution of the difference between reported speed and resampled speed<br />

for a ship travelling at its average speed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!