10.12.2012 Views

Low Impact Development Manual for Michigan - OSEH - University ...

Low Impact Development Manual for Michigan - OSEH - University ...

Low Impact Development Manual for Michigan - OSEH - University ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Inspect the filter strip and the bypass swale and<br />

make repairs as needed. Look <strong>for</strong>:<br />

° Damaged turf rein<strong>for</strong>cement or riprap rolling<br />

downhill,<br />

° Erosion within the buffer or swale, and<br />

° Gullies or sediment flows from concentrated<br />

flows downhill of level spreader,<br />

Once a year:<br />

• Remove any weeds or shrubs growing on level<br />

spreader or in swale.<br />

Cost<br />

Level spreaders are relatively inexpensive and easy<br />

to construct. There are various types of level spreaders,<br />

so costs will vary. Per foot material and equipment<br />

cost will range from $5 to $20 depending on the type<br />

of level spreader desired. Concrete level spreaders may<br />

cost significantly more than per<strong>for</strong>ated pipes or berms,<br />

but they provide a more sure level surface, are easier to<br />

maintain, and more reliable.<br />

LID <strong>Manual</strong> <strong>for</strong> <strong>Michigan</strong> – Chapter 7 Page 226

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!