Case Study: City of Battle Creek City<br />

Hall Runoff Project<br />

City of Battle Creek, MI<br />

The City of Battle Creek City Hall Runoff Project was designed to treat<br />

stormwater runoff from a municipal complex adjacent to the Battle Creek<br />

River, a tributary of the Kalamazoo River. The goal of the project was to treat<br />

one-half inch of rainstorm runoff by incorporating several best management<br />

techniques (BMPs) that promote infiltration and low impact development.<br />

The BMPs included a vegetated roof system on the Police Department roof;<br />

infiltration of runoff water from the impervious walkway in front of the<br />

Police Department building; and infiltration from the parking lots behind<br />

and adjacent to City Hall and the Police Department buildings.<br />

Green roof on City of Battle Creek Police Department building<br />

Source: City of Battle Creek<br />

The green roof is primarily an extensive system with the exception of a<br />

band around the perimeter of the roof which is intensive. The load reductions<br />

on the roof have been revised to accommodate the additional system.<br />

The City of Battle Creek is responsible <strong>for</strong> the light maintenance needed<br />

<strong>for</strong> the vegetated roof. Keeping the native plants, mainly sedum, properly<br />

watered during establishment did pose a challenge. Replanting was required<br />

in some areas.<br />

Case Study Site Considerations<br />

Project Type Extensive Green Roof<br />

Estimated Total<br />

Project Cost<br />

Maintenance<br />

Responsibility<br />

$520,252 <strong>for</strong> roof reconstruction plus green roof; green roof<br />

materials alone were $121,635<br />

City of Battle Creek<br />

Project Contact Christine Kosmowski, 269-966-0712<br />

Estimated Annual<br />

Pollutant Load<br />

Reductions:<br />

• Sediment – 3.8 tons<br />

• Nitrogen – 101 lbs.<br />

• Phosphorous – 16 lbs.<br />

• Volume – 68 percent<br />

Another goal of the City of<br />

Battle Creek City Hall Runoff<br />

Project was to increase community<br />

awareness of low impact<br />

development techniques and their<br />

water quality protection benefits.<br />

The City is promoting the area<br />

as a demonstration site <strong>for</strong> local<br />

builders and homeowners.<br />

LID <strong>Manual</strong> <strong>for</strong> <strong>Michigan</strong> – Chapter 7 Page 302