10.12.2012 Views

Low Impact Development Manual for Michigan - OSEH - University ...

Low Impact Development Manual for Michigan - OSEH - University ...

Low Impact Development Manual for Michigan - OSEH - University ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Detention BMP Inspection Checklist*<br />

Project Location: ______________________________________________________________________________<br />

Date/Time: __________________________________________________________________________________<br />

Inspector: ____________________________________________________________________________________<br />

Maintenance Item<br />

Inlet/Outlet Pipes<br />

Structural integrity of inlet/outlet (Are any inlet<br />

pipes broken, crumbling, separated?)<br />

List Inlet Pipes Approximate Diameter and Type of<br />

Material<br />

Inlet Pipe 1 _____________________________<br />

Inlet Pipe 2 _____________________________<br />

Inlet Pipe 3 _____________________________<br />

Outlet Pipe Size/Type ______________________<br />

Riprap at inlet pipe (Is the riprap still present? Is it<br />

visible and not covered with sediment?<br />

Stone around outlet pipe (Is the stone clogged with<br />

debris and/or sediment?)<br />

Trash or debris blocking inlet/outlet (Inspect to<br />

ensure no major obstructions hindering general<br />

functionality)<br />

Inspect/clean catch basin upstream of the BMP if<br />

accessible.<br />

Inspect inlets and outlet <strong>for</strong> erosion (Are there<br />

eroded areas around the pipes?)<br />

Inspect overflow spillway <strong>for</strong> signs of erosion.<br />

Satisfactory/<br />

Unsatisfactory<br />

Recommended<br />

Inspection<br />

Frequency<br />

Comments<br />

Pretreatment (if applicable) (Might include sediment <strong>for</strong>ebay, upstream catch basin, bioswale, rain garden, swirl<br />

concentrator)<br />

Device functioning to trap/collect sediment A<br />

Remove accumulated sediment as appropriate <strong>for</strong><br />

the pretreatment device. <strong>for</strong>ebay<br />

Detention Pond A<br />

Inspection frequency key — A = Annual, M = Monthly, S = After major storm<br />

*It is recommended to review and inspect the basin with the engineering as-built plans.<br />

LID <strong>Manual</strong> <strong>for</strong> <strong>Michigan</strong> – Appendix F Page 446<br />

A<br />

A<br />

A<br />

M<br />

A<br />

A<br />

A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!