10.12.2012 Views

Low Impact Development Manual for Michigan - OSEH - University ...

Low Impact Development Manual for Michigan - OSEH - University ...

Low Impact Development Manual for Michigan - OSEH - University ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROJECT:<br />

Subwatershed:<br />

Storm Event<br />

WORKSHEET 7. PEAK RATE MITIGATION SUMMARY SHEET<br />

1-year 24<br />

2-year 24<br />

5-year 24<br />

10-year 24<br />

25-year 24<br />

50-year 24<br />

100-year 24<br />

1 - As determined by computer simulation, acceptable calculation methods, etc.<br />

2 - If applicable to the peak rate criteria.<br />

Notes, Special Conditions, etc.:<br />

Applicable Peak Rate Criteria (e.g. pre- vs. post, release rate):<br />

Storm<br />

Duration<br />

(hr)<br />

Additional Flood Control Criteria (if applicable):<br />

Are criteria<br />

applicable to<br />

this storm?<br />

(Yes / No)<br />

Post-<br />

Settlement<br />

Peak<br />

Discharge<br />

Rate 1 (cfs)<br />

Pre-Settlement<br />

Peak Discharge<br />

Rate 1,2 (cfs)<br />

Other peak<br />

rate criteria,<br />

if applicable<br />

(cfs)<br />

Are the<br />

criteria met?<br />

(Yes / No)<br />

LID <strong>Manual</strong> <strong>for</strong> <strong>Michigan</strong> – Chapter 9 Page 383

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!