10.12.2012 Views

Low Impact Development Manual for Michigan - OSEH - University ...

Low Impact Development Manual for Michigan - OSEH - University ...

Low Impact Development Manual for Michigan - OSEH - University ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Each fact sheet includes:<br />

BMP Fact Sheet<br />

Title<br />

Short definition of BMP<br />

Applications – Indicates in what type of land use BMP is applicable or<br />

feasible (Yes, No, or Limited).<br />

Stormwater Quantity Functions – Indicates how well the BMP functions<br />

in mitigating stormwater management criteria (High, Medium, or <strong>Low</strong>).<br />

Stormwater Quality Functions – Indicates how well the BMP per<strong>for</strong>ms in<br />

terms of pollutant removal (High, Medium, or <strong>Low</strong>).<br />

Applications Stormwater Quantity Functions<br />

Residential Volume<br />

Commercial<br />

Groundwater<br />

Recharge<br />

Ultra Urban Peak Rate<br />

Industrial Stormwater Quality Functions<br />

Retrofit<br />

Highway/Road<br />

Recreational<br />

TSS – Total<br />

Suspended Solids<br />

TP – Total<br />

Phosphorus<br />

TN or NO3 – Total<br />

Nitrogen/Nitrate<br />

Temperature<br />

Additional Considerations<br />

Cost – Indicate whether cost is high, medium or low by the following categories<br />

• High – => adds more than 5% to total project cost<br />

• Medium – adds 1–5% to total project cost<br />

• <strong>Low</strong> – =< adds less than 1% to total project cost<br />

Maintenance – Indicates level of maintenance required to maintain BMP<br />

(High, Medium, or <strong>Low</strong>).<br />

• High – Maintenance intensive (i.e., year-round maintenance)<br />

• Medium – Several times per year<br />

• <strong>Low</strong> – One time per year<br />

Winter Per<strong>for</strong>mance – Indicates if BMP provides equivalent per<strong>for</strong>mance<br />

throughout the winter (High, Medium, or <strong>Low</strong>)<br />

• High – BMP per<strong>for</strong>ms very well in winter conditions<br />

• Medium – BMP has reduced per<strong>for</strong>mance in winter conditions<br />

• <strong>Low</strong> – BMP still per<strong>for</strong>ms in winter conditions, but per<strong>for</strong>mance is<br />

significantly reduced.<br />

Variations<br />

(optional)<br />

List of variations to the BMP if<br />

applicable<br />

Key Design<br />

Features<br />

Bulleted list of in<strong>for</strong>mation that<br />

is key to the design of BMP<br />

Site Factors<br />

(optional)<br />

List of specific factors that relate<br />

to BMP per<strong>for</strong>mance:<br />

• Water table/bedrock separation<br />

distance<br />

• Soil type<br />

• Feasibility on steeper slopes<br />

• Applicability on potential<br />

hotspots (e.g., brownfields)<br />

Benefits<br />

List of benefits directly related to<br />

implementing the BMP<br />

Limitations<br />

List of site constraints associated<br />

with implementation<br />

LID <strong>Manual</strong> <strong>for</strong> <strong>Michigan</strong> – Chapter 6 Page 59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!