Circular City Ports - Workbook 1, Circular initiatives in the Delta
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1 Area Manager Kanaalkant Antwerpen<br />
19<br />
What is <strong>the</strong> relation with <strong>the</strong> port and water?<br />
The Albert Canal is an important channel, however<br />
not many companies make use of its possibilities.<br />
One of <strong>the</strong> ambitions and mission of <strong>the</strong> area manager<br />
is to <strong>in</strong>crease <strong>the</strong> waterborne freight transport.<br />
Here<strong>in</strong>, <strong>the</strong>re were already some possible projects<br />
tested toge<strong>the</strong>r with a transport-expert to <strong>in</strong>crease<br />
<strong>the</strong> use of <strong>the</strong> waterways.<br />
What is <strong>the</strong> relation with <strong>the</strong> city?<br />
Hous<strong>in</strong>g is situated close to <strong>the</strong> <strong>in</strong>dustry here. A conceptstudy<br />
<strong>in</strong> 2016 explored <strong>the</strong> possible exchanges<br />
between <strong>the</strong>se two functions, mostly focuss<strong>in</strong>g on<br />
heat exchange or clos<strong>in</strong>g of material cycles.<br />
Also, <strong>in</strong> certa<strong>in</strong> area’s, <strong>the</strong>y are look<strong>in</strong>g for economical<br />
programm<strong>in</strong>g <strong>in</strong> relation to <strong>the</strong> neighbourhood;<br />
this <strong>in</strong> <strong>the</strong> form of fablabs <strong>in</strong> relation to exist<strong>in</strong>g technical<br />
schools or learn<strong>in</strong>g trajectories.<br />
What are <strong>the</strong> ambitions?<br />
Upgrad<strong>in</strong>g of <strong>the</strong> second largest bus<strong>in</strong>ess park <strong>in</strong><br />
<strong>the</strong> prov<strong>in</strong>ce of Antwerp (400ha), located on <strong>the</strong><br />
Albert Canal. In this process it became clear that<br />
economic and area-oriented development must go<br />
hand <strong>in</strong> hand. The plan area is fur<strong>the</strong>r characterized<br />
by a large number of historically outdated <strong>in</strong>dustrial<br />
build<strong>in</strong>gs, a strong <strong>in</strong>terweav<strong>in</strong>g with <strong>the</strong> urban area,<br />
problematic mobility and a large fragmentation. An<br />
area manager was appo<strong>in</strong>ted <strong>in</strong> this context. By<br />
means of projects to make <strong>the</strong> bus<strong>in</strong>ess park more<br />
susta<strong>in</strong>able, stimulate entrepreneurship and improve<br />
access to <strong>the</strong> site (e.g. transport via water,<br />
bridg<strong>in</strong>g <strong>the</strong> gap between <strong>in</strong>dustry and hous<strong>in</strong>g).<br />
Who is beh<strong>in</strong>d it?<br />
The prov<strong>in</strong>ce works toge<strong>the</strong>r with <strong>the</strong> prov<strong>in</strong>cial development<br />
company POM, <strong>the</strong> city of Antwerp, <strong>the</strong><br />
districts of Deurne and Merksem, <strong>the</strong> municipalities<br />
of Schoten and Wijnegem, <strong>the</strong> Flemish government<br />
and nv De Scheepvaart, <strong>the</strong> manager of <strong>the</strong> Albert<br />
channel. The area manager takes care of <strong>the</strong> startup,<br />
acceleration and follow-up of <strong>the</strong> (re)development<br />
of a large site or a cluster of sites. This is done<br />
from <strong>the</strong> public side on <strong>the</strong> divid<strong>in</strong>g l<strong>in</strong>e with <strong>the</strong> private<br />
sector. As soon as possible, cooperation with<br />
<strong>the</strong> private sector takes place at various levels (direct<strong>in</strong>g,<br />
facilitat<strong>in</strong>g, structur<strong>in</strong>g, f<strong>in</strong>anc<strong>in</strong>g, acquir<strong>in</strong>g).<br />
This cooperation is necessary depend<strong>in</strong>g on<br />
<strong>the</strong> project and not with a view to commercialisation<br />
by <strong>the</strong> area manager.<br />
Sources<br />
1.Participatiemaatschappij Vlaanderen<br />
2. De Vlaamse Waterweg nv<br />
What is <strong>the</strong><br />
timeframe?<br />
Masterplan<br />
Kaderplan (Framework Plan):<br />
broadly supported vision<br />
and action programme about<br />
economy and area-oriented<br />
Concept study:<br />
‘Verduurzam<strong>in</strong>g’,<br />
focus<strong>in</strong>g on susta<strong>in</strong>ability<br />
questions, also<br />
through projects<br />
Appo<strong>in</strong>tment of<br />
Area Manager by<br />
Prov<strong>in</strong>ce of Antwerp<br />
2010 2014 2016 2018<br />
The area is strategically located on <strong>the</strong> Albert Canal, close to <strong>the</strong> harbour<br />
and is surrounded by residential fabric.<br />
View on a part of <strong>the</strong> bus<strong>in</strong>ess park, conta<strong>in</strong><strong>in</strong>g <strong>in</strong>dustry, <strong>the</strong> canal and<br />
hous<strong>in</strong>g.