31.12.<strong>2008</strong> OFFSHORE WIND FARM IN BELGIUM<br />

On the Thornton Bank site, some 30 km off<br />

the coast of Ostend, <strong>VINCI</strong> Construction’s<br />

Belgian teams erected the first six wind turbines<br />

after designing, building and positioning<br />

the foundations. Ultimately, the C-Power<br />

wind farm will have about 60 turbines. The<br />

first of these, 183 metres high at the tip of its<br />

blade, was connected to the Belgian national<br />

grid on 31 December <strong>2008</strong>. On completion,<br />

the farm will have an installed capacity of<br />

about 300 MW, which would meet the power<br />

needs of a town with a population of 600,000.