12.11.2023 Aufrufe

vgbe energy journal 11 (2022) - International Journal for Generation and Storage of Electricity and Heat

vgbe energy journal - International Journal for Generation and Storage of Electricity and Heat. Issue 11 (2022). Technical Journal of the vgbe energy e.V. - Energy is us! NOTICE: Please feel free to read this free copy of the vgbe energy journal. This is our temporary contribution to support experience exchange in the energy industry during Corona times. The printed edition, subscription as well as further services are available on our website, www.vgbe.energy +++++++++++++++++++++++++++++++++++++++++++++++++++++++

vgbe energy journal - International Journal for Generation and Storage of Electricity and Heat.
Issue 11 (2022).
Technical Journal of the vgbe energy e.V. - Energy is us!

NOTICE: Please feel free to read this free copy of the vgbe energy journal. This is our temporary contribution to support experience exchange in the energy industry during Corona times. The printed edition, subscription as well as further services are available on our website, www.vgbe.energy

+++++++++++++++++++++++++++++++++++++++++++++++++++++++

MEHR ANZEIGEN
WENIGER ANZEIGEN
  • Keine Tags gefunden...

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

Nuclear power plants: Operating results<br />

Plants in direct exchange <strong>of</strong> experience with <strong>vgbe</strong> <strong>energy</strong> I September <strong>2022</strong><br />

Nuclear<br />

power plant<br />

Country<br />

Type<br />

Nominal<br />

capacity<br />

Gross Net<br />

MW<br />

MW<br />

Operating<br />

time<br />

generator<br />

in h<br />

Energy generated<br />

(gross generation) MWh<br />

Month Year 4 commis-<br />

Since<br />

sioning<br />

Time<br />

availability %<br />

Unit capability<br />

factor % 1<br />

Energy unavailability<br />

% 1<br />

Energy<br />

utilisation % 1<br />

Planned 2 Unplanned 3<br />

Month Year 4 Month Year 4 Postponable Not postponable Month Year 4<br />

Month Year 4<br />

Month Year 4 Month Year 4<br />

GKN-II Neckarwestheim DE PWR 1400 1310 720 992 450 8 313 950 370 816 794 100.00 92.55 99.93 92.53 0.07 7.47 0 0 0 0 98.70 90.83 -<br />

KKE Emsl<strong>and</strong> DE PWR 1406 1335 720 1 006 384 8 330 664 388 697 948 100.00 93.15 100.00 93.09 0 6.91 0 0 0 0 99.46 90.42 -<br />

KKI-2 Isar DE PWR 1485 1410 720 1 057 069 9 372 259 398 869 587 100.00 99.39 100.00 99.34 0 0.01 0 0 0 0.65 98.60 95.97 -<br />

OL1 Olkiluoto FI BWR 920 890 720 663 398 5 135 6<strong>11</strong> 289 836 522 100.00 85.77 100.00 85.13 0 12.10 0 2.69 0 0.08 100.15 85.21 -<br />

OL2 Olkiluoto FI BWR 920 890 720 658 488 5 774 308 279 962 239 100.00 96.63 99.90 96.36 0.10 3.64 0 0 0 0 99.41 95.81 -<br />

KCB Borssele NL PWR 512 484 720 357 961 3 033 605 178 930 358 100.00 91.99 100.00 91.99 0 8.01 0 0 0 0 97.02 90.46 -<br />

KKB 1 Beznau CH PWR 380 365 720 269 387 1 832 099 138 242 646 100.00 76.86 100.00 76.39 0 20.02 0 0 0 3.59 98.41 73.46 7<br />

KKB 2 Beznau CH PWR 380 365 720 267 129 2 271 439 145 616 700 100.00 94.84 100.00 94.63 0 5.37 0 0 0 0 97.67 91.13 7<br />

KKG Gösgen CH PWR 1060 1010 720 757 594 6 040 645 345 245 471 100.00 87.90 99.98 87.39 0.02 12.61 0 0 0 0 99.27 86.99 7<br />

CNT-I Trillo ES PWR 1066 1003 720 756 080 5 900 478 277 853 419 100.00 86.08 99.95 85.82 0.05 12.05 0 0 0 2.12 97.62 83.85 -<br />

Dukovany B1 CZ PWR 500 473 720 352 202 2 637 175 126 089 958 100.00 83.41 100.00 82.80 0 17.04 0 0 0 0.15 97.83 80.51 -<br />

Dukovany B2 CZ PWR 500 473 720 350 733 2 738 248 121 130 090 100.00 86.<strong>11</strong> 100.00 85.64 0 14.36 0 0 0 0 97.43 83.60 -<br />

Dukovany B3 CZ PWR 500 473 708 334 494 3 163 013 120 126 936 98.33 99.82 97.90 99.69 2.10 0.31 0 0 0 0 92.92 96.57 -<br />

Dukovany B4 CZ PWR 500 473 720 356 656 2 572 046 120 814 370 100.00 79.71 99.99 79.66 0.01 19.91 0 0 0 0.43 99.07 78.52 -<br />

Temelin B1 CZ PWR 1086 1036 720 786 329 5 710 432 143 287 270 100.00 80.14 99.94 79.86 0.06 20.07 0 0 0.01 0.07 100.56 80.27 -<br />

Temelin B2 CZ PWR 1086 1036 419 445 462 5 729 770 139 175 338 58.19 80.03 56.43 79.77 43.57 19.52 0 0 0 0.72 56.97 80.54 2<br />

Doel 1 BE PWR 467 445 720 332 784 2 683 643 146 454 643 100.00 89.09 99.01 88.36 0 10.14 0 0 0.99 1.50 99.01 87.80 -<br />

Doel 2 BE PWR 467 445 720 329 701 2 716 298 144 996 922 100.00 90.60 97.82 89.71 0 9.88 0 0 2.18 0.41 97.82 88.57 -<br />

Doel 3 BE PWR 1056 1006 550 436 496 6 546 949 286 160 632 76.32 97.40 56.10 95.17 43.90 4.83 0 0 0 0.01 56.10 93.85 2<br />

Doel 4 BE PWR 1086 1038 720 779 056 7 063 640 292 862 089 100.00 100.00 98.12 99.77 0 0 0 0 1.88 0.23 98.12 97.93 -<br />

Tihange 1 BE PWR 1009 962 376 336 608 3 046 726 319 689 957 52.28 46.84 46.23 46.10 5.58 17.09 0 0 48.19 36.81 46.23 46.23 2<br />

Tihange 2 BE PWR 1055 1008 720 739 741 5 467 286 279 059 <strong>11</strong>7 100.00 83.29 98.23 80.23 0.03 16.14 0 0 1.74 3.63 98.23 79.67 -<br />

Tihange 3 BE PWR 1089 1038 720 770 035 5 749 549 301 797 593 100.00 83.08 98.10 82.39 0.04 17.39 0 0 1.86 0.22 98.10 80.56 -<br />

Remarks<br />

PWR: Pressurised water reactor<br />

BWR: Boiling water reactor<br />

1<br />

Net-based values (Czech <strong>and</strong> Swiss nuclear<br />

power plants gross-based)<br />

2<br />

Planned: the beginning <strong>and</strong> duration <strong>of</strong><br />

unavailability have to be determined more<br />

than 4 weeks be<strong>for</strong>e commencement<br />

3<br />

Unplanned: the beginning <strong>of</strong> unavailability<br />

cannot be postponed or only within 4 weeks.<br />

All values were entered in the column not<br />

postponable.<br />

– Postponable: the beginning <strong>of</strong> unavailability<br />

can be postponed more than 12 hours to 4<br />

weeks.<br />

– Not postponable: the beginning <strong>of</strong> unavailability<br />

cannot be postponed or only within 12<br />

hours.<br />

4<br />

Beginning <strong>of</strong> the year<br />

5<br />

Final data were not yet available in print<br />

Remarks:<br />

1 Refuelling<br />

2 Inspection<br />

3 Repair<br />

4 Stretch-out-operation<br />

5 Stretch-in-operation<br />

6 Here<strong>of</strong> traction supply:<br />

7 Here<strong>of</strong> steam supply:<br />

KKB 1 Beznau<br />

Month: <br />

754 MWh<br />

Since the beginning <strong>of</strong> the year: 12,467 MWh<br />

Since commissioning:<br />

601,985 MWh<br />

KKB 2 Beznau<br />

Month:<br />

0 MWh<br />

Since the beginning <strong>of</strong> the year: 2,138 MWh<br />

Since commissioning:<br />

138,650 MWh<br />

KKG Gösgen<br />

Month:<br />

6,722 MWh<br />

Since the beginning <strong>of</strong> the year: 56,810 MWh<br />

Since commissioning: 2,604,084 MWh<br />

8 New nominal capacity since January <strong>2022</strong><br />

86 | <strong>vgbe</strong> <strong>energy</strong> <strong>journal</strong> <strong>11</strong> · <strong>2022</strong>

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!