A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
37. Monden, Yasuhiro (1998) "Toyota production system: an <strong>in</strong>tegrated approach to<br />
just-<strong>in</strong>time," Eng<strong>in</strong>eer<strong>in</strong>g and Management Press. Norcross, GA. 3 rd ed.<br />
38. Moser, L., and dos Santos, A., (2003) “Explor<strong>in</strong>g the role <strong>of</strong> visual controls on<br />
mobile cell manufactur<strong>in</strong>g: A case study on drywall technology.” Proc., Int.<br />
Group for <strong>Lean</strong> <strong>Construction</strong> 11th Annual Conf. (IGLC-11), IGLC, Blacksburg,<br />
Va., 11–23, _http://www.strobos.cee.vt.edu. Access date 1/5/ 2008.<br />
39. Ohno, T., (1988)," Just-<strong>in</strong>-Time for Today and Tomorrow", <strong>in</strong> T. Ohno with S.<br />
Mito, trans. J. P. Schmelzeis, Productivity Press.<br />
40. Owell, G. (1999) “What is lean construction?” Proc., Int. Group for <strong>Lean</strong><br />
<strong>Construction</strong> 7th Annual Conf. (IGLC-7), IGLC, Berkeley, Calif., 1–10.<br />
41. Pheng, L.S. and Hui, M.S., (1999), "The Application <strong>of</strong> JIT philosophy to<br />
construction: a case study <strong>in</strong> site layout," Journal <strong>of</strong> <strong>Construction</strong> Management<br />
and Economics, 17(5), 657-668.<br />
42. Pritsker, A. B.,(1986), “Introduction to Simulation and SLAMM II”. Systems<br />
Publish<strong>in</strong>g Corporation, West Lafayette, Indiana.<br />
43. Rummler, Geary A. and Brache, Alan P., (1990),"Improv<strong>in</strong>g Performance,"<br />
Jossey-Bass Publishers, San Francisco. 227 p.<br />
44. Rob<strong>in</strong>son, A., (1991), "Cont<strong>in</strong>uous Improvement <strong>in</strong> Operations; A systematic<br />
Approach to Waste Reduction," Productivity Press, USA.<br />
45. Said, S. (2006), "Mang<strong>in</strong>g and M<strong>in</strong>imiz<strong>in</strong>g <strong>Construction</strong> Waste <strong>in</strong> the <strong>Gaza</strong><br />
<strong>Strip</strong>", Thesis for the Degree <strong>of</strong> Master <strong>of</strong> Science <strong>in</strong> <strong>Construction</strong> Management<br />
at Islamic University <strong>of</strong> <strong>Gaza</strong>.<br />
46. Salem, O., Solomon, J., and Genaidy, A., (2006), “<strong>Lean</strong> <strong>Construction</strong>: From<br />
theory to implementation”, Journal <strong>of</strong> Management <strong>in</strong> Eng<strong>in</strong>eer<strong>in</strong>g, 22( 4)168-<br />
176.<br />
47. Sameh M., (2008), “ Toyota Manufactur<strong>in</strong>g System”, Researches,<br />
http://samehar.wordpress.com. Access date 1/11/2008.<br />
48. Saukkoriipi L., (2004), “Perspectives on no-value added activities: The case <strong>of</strong><br />
piece-rate <strong>in</strong> the Swedish construction <strong>in</strong>dustry”, Build<strong>in</strong>g Economics and<br />
Management, Chalmers University <strong>of</strong> Technology, Göteborg.<br />
49. Schonberger, Richard J., (1986), "World class manufactur<strong>in</strong>g," The Free Press, New<br />
York.<br />
50. Schwaber, K., (2002), "Agile S<strong>of</strong>tware Development with Scrum," Prentice<br />
Hall. Upper Saddle River, NJ.<br />
87