28/10/2003<br />

30/10/2003<br />

01/11/2003<br />

02/11/2003<br />

03/11/2003<br />

04/11/2003<br />

05/11/2003<br />

06/11/2003<br />

08/11/2003<br />

09/11/2003<br />

10/11/2003<br />

11/11/2003<br />

12/11/2003<br />

13/11/2003<br />

15/11/2003<br />

16/11/2003<br />

17/11/2003<br />

18/11/2003<br />

19/11/2003<br />

20/11/2003<br />

22/11/2003<br />

23/11/2003<br />

24/11/2003<br />

29/11/2003<br />

30/11/2003<br />

01/12/2003<br />

04/12/2003<br />

07/12/2003<br />

08/12/2003<br />

09/12/2003<br />

10/12/2003<br />

11/12/2003<br />

13/12/2003<br />

14/12/2003<br />

15/12/2003<br />

16/12/2003<br />

17/12/2003<br />

Form work wall "c" and column "B"<br />

Column and wall "c" and manhole work "B"<br />

Cast column and wall "c" and manhole work "B" and clean<strong>in</strong>g work<br />

Manhole work "BC" and remove form work "C"<br />

Manhole work "BC" and remove form work "C"<br />

Back fill<strong>in</strong>g between ground beam and mechanic work and steel<br />

work" wall B"<br />

Back fill<strong>in</strong>g between ground beam and Form work "B" and<br />

Mechanical work<br />

Back fill<strong>in</strong>g and mechanic work<br />

Back fill<strong>in</strong>g and mechanic work and steel work for column A"<br />

Steel work and Mechanic work and Column and wall "B"<br />

Column and wall 'AB" and Mechanic work<br />

Column and wall 'AB" and Mechanic work<br />

Column and wall 'AB" and Mechanic work and ground floor steel<br />

work<br />

Cast "A" Column and wall and steel ground floor "AB" and<br />

formwork wall and column and mechanical work<br />

Remove form work "A" column and wall and Ground floor "B" and<br />

Form work wall and column "B" and Mechanical work<br />

Cast "c" ground floor and Form work column "<br />

B" remove form work wall and column "A"<br />

Form work column "B”, ground floor work "B" and remove form<br />

work column "A"<br />

Form work column, ground floor AB and Mechanical work and<br />

ground floor slab form work<br />

Form work column "B", ground floor work AB and mechanical work<br />

and Slab form work "c"<br />

Cast ground floor " AB" and Form work column "B" and Form work<br />

slab "c"<br />

Cast column "c", electric work "b", slab work "c" and Ground floor<br />

"B"<br />

Column "B", slab "c" and Ground floor "B"<br />

Cast column "B" and Remove 7 column and Ground floor work<br />

Steel wall and column , slab work "c" and ground floor "B"<br />

Slab "c 'and Wall "B"<br />

Cast ground floor 550m2 "B', slab "c" and wall work "B"<br />

Cast wall "B"<br />

Remove form work band steel work slab "c" and form work "A" slab<br />

Remove form work for wall "B", slab "CA "and column work "B"<br />

Cast column "B", Slab steel, mechanic work "CA" and Remove form<br />

work wall "B".<br />

Slab "AC"<br />

Slab Work "AC" and Cast column "A"<br />

Slab work "AC"<br />

Slab work "AC"<br />

Slab work "AC"<br />

Cast slab "c"and Slab work "AC"and Wall work<br />

Slab work "A"and Column work "c"<br />