- Page 1: The Islamic University of Gaza Dean
- Page 6 and 7: ABSTRACT This research deals with t
- Page 8 and 9: 2.5.6 Increase Output Flexibility .
- Page 10 and 11: Appendices Appendix (A): Daily Repo
- Page 12 and 13: List of Tables Table 2.1: Conceptua
- Page 14 and 15: List of Figures Figure 2.1: Reducti
- Page 16 and 17: 1.1 Statement of the Problem Most o
- Page 18 and 19: 2.1 Lean Construction History Chapt
- Page 20 and 21: 2.3 Impact of Lean Construction Acc
- Page 22 and 23: Table 2.1 Conceptualization of lean
- Page 24 and 25: for measuring the percent plan comp
- Page 26 and 27: 2.5.6 Increase output flexibility F
- Page 28 and 29: � The more wastes inherent in the
- Page 30 and 31: 3. System requires the need to deve
- Page 32 and 33: the work flow, material flow, produ
- Page 34 and 35: • Straighten Next, materials were
- Page 36 and 37: Material Productivity = Total Outpu
- Page 38 and 39: investigation showed that 25 percen
- Page 40 and 41: 7. Poor technology of equipment. 8.
- Page 42 and 43: 2. Unnecessary material handling. 3
- Page 44 and 45: inventory (Wrong storage of materia
- Page 46 and 47: Main Activity Mobilization and exca
- Page 48 and 49: 4. Sort the candidates in order of
- Page 50 and 51: 4.2 Project Activities Lean constru
- Page 52 and 53: Table 4.2 represents the resources,
- Page 54 and 55:
Main Activity Slab work Building wo
- Page 56 and 57:
4.4.1 Mobilization and excavation T
- Page 58 and 59:
4.4.4 Neck column Table (4.6) shows
- Page 60 and 61:
4.4.7 Ground beam The twelve proces
- Page 62 and 63:
4.4.10 Ground floor slab The eleven
- Page 64 and 65:
No. 9 10 11 Table 4.14 Non-value ad
- Page 66 and 67:
4.5 Remove or Reduce the Influence
- Page 68 and 69:
The result by using arena simulatio
- Page 70 and 71:
Table 4.17 Simulation results No. A
- Page 72 and 73:
Table 4.17 Simulation results (Cont
- Page 74 and 75:
4.5.3 Foundation Table (4.20) shows
- Page 76 and 77:
4.5.7 Ground beam Table (4.24) show
- Page 78 and 79:
4.5.11 Column first floor Table (4.
- Page 80 and 81:
4.6 Identify the Cause of Waste Tab
- Page 82 and 83:
Percent of value adding time 35% 30
- Page 84 and 85:
Table 4.33 Total project duration N
- Page 86 and 87:
Then, the processes with the greate
- Page 88 and 89:
number of workers to 12 workers sho
- Page 90 and 91:
Activity Process Ground floor Colum
- Page 92 and 93:
Actual project duration was 6000 ho
- Page 94 and 95:
Date Process Assigned Process Compl
- Page 96 and 97:
5.1 Conclusion Chapter Five Conclus
- Page 98 and 99:
References 1. Abudallah Fawaz , (20
- Page 100 and 101:
27. Graham, P. and Smithers, G., (1
- Page 102 and 103:
51. Serpell, A.; Venturi, A. and Co
- Page 104 and 105:
Appendices (A) Daily report Date Ac
- Page 106 and 107:
04/09/2003 06/09/2003 07/09/2003 08
- Page 108 and 109:
18/12/2003 20/12/2003 21/12/2003 22
- Page 110 and 111:
11/04/2004 12/04/2004 13/04/2004 14
- Page 112 and 113:
Appendix (B) Arena Simulation Compu
- Page 114: