51. Serpell, A.; Venturi, A. and Contreras, J., (1995), "Characterization <strong>of</strong> Waste <strong>in</strong> Build<strong>in</strong>g <strong>Construction</strong> Projects,” In Alarcon, Luis (1997, Ed.) <strong>Lean</strong> <strong>Construction</strong>, A.A. Balkema, Netherlands. 52. Skoyles, E.R. and Skoyles, J.R., (1987), "Waste Prevention on Site. The Mitchell Publish<strong>in</strong>g Company Limited," London. 53. Stalk, G. jr. and Hout, T.M., (1989), "Compet<strong>in</strong>g aga<strong>in</strong>st time" Free Press, NY. 54. Stewart, Thomas A., (1992),"The Search for the Organization <strong>of</strong> Tomorrow". Fortune, May 18, 92 - 98. 55. Stuart D. Green and Susan C., (2005), "<strong>Lean</strong> construction: arenas <strong>of</strong> enactment, models <strong>of</strong> diffusion and the mean<strong>in</strong>g <strong>of</strong> ‘leanness," Build<strong>in</strong>g Research and Information , 33(6), 498–511. 56. Womack, J. and Jones D., (1990), "The Mach<strong>in</strong>e that Changed the World, Campus Pres. 57. Womack, J.P. and Jones, D.T., (1996),"<strong>Lean</strong> Th<strong>in</strong>k<strong>in</strong>g", Simon and Schuster, New York, NY. 58. Yahia, A., (2004), "Time Schedule Preparation by Predict<strong>in</strong>g Production Rate Us<strong>in</strong>g Simulation", Thesis for the Degree <strong>of</strong> Master <strong>of</strong> Science <strong>in</strong> <strong>Construction</strong> Management at Islamic University <strong>of</strong> <strong>Gaza</strong>. 88
Appendix A Daily Report. Appendix B Arena Simulation. List <strong>of</strong> Appendices Appendix C Simulation result <strong>of</strong> the project before apply<strong>in</strong>g eight po<strong>in</strong>ts and after apply<strong>in</strong>g lean tools. Appendix D Simulation Result after apply<strong>in</strong>g "0" for three biggest non-value added processes <strong>of</strong> the project dur<strong>in</strong>g apply<strong>in</strong>g eight po<strong>in</strong>ts. 89