- Page 1:
The Islamic University of Gaza Dean
- Page 4 and 5:
Acknowledgment I would like to expr
- Page 6 and 7:
ABSTRACT This research deals with t
- Page 8 and 9:
2.5.6 Increase Output Flexibility .
- Page 10 and 11:
Appendices Appendix (A): Daily Repo
- Page 12 and 13:
List of Tables Table 2.1: Conceptua
- Page 14 and 15:
List of Figures Figure 2.1: Reducti
- Page 16 and 17:
1.1 Statement of the Problem Most o
- Page 18 and 19:
2.1 Lean Construction History Chapt
- Page 20 and 21:
2.3 Impact of Lean Construction Acc
- Page 22 and 23:
Table 2.1 Conceptualization of lean
- Page 24 and 25:
for measuring the percent plan comp
- Page 26 and 27:
2.5.6 Increase output flexibility F
- Page 28 and 29:
� The more wastes inherent in the
- Page 30 and 31:
3. System requires the need to deve
- Page 32 and 33:
the work flow, material flow, produ
- Page 34 and 35:
• Straighten Next, materials were
- Page 36 and 37:
Material Productivity = Total Outpu
- Page 38 and 39:
investigation showed that 25 percen
- Page 40 and 41:
7. Poor technology of equipment. 8.
- Page 42 and 43:
2. Unnecessary material handling. 3
- Page 44 and 45:
inventory (Wrong storage of materia
- Page 46 and 47:
Main Activity Mobilization and exca
- Page 48 and 49:
4. Sort the candidates in order of
- Page 50 and 51:
4.2 Project Activities Lean constru
- Page 52 and 53:
Table 4.2 represents the resources,
- Page 54 and 55:
Main Activity Slab work Building wo
- Page 56 and 57:
4.4.1 Mobilization and excavation T
- Page 58 and 59:
4.4.4 Neck column Table (4.6) shows
- Page 60 and 61:
4.4.7 Ground beam The twelve proces
- Page 62 and 63:
4.4.10 Ground floor slab The eleven
- Page 64 and 65: No. 9 10 11 Table 4.14 Non-value ad
- Page 66 and 67: 4.5 Remove or Reduce the Influence
- Page 68 and 69: The result by using arena simulatio
- Page 70 and 71: Table 4.17 Simulation results No. A
- Page 72 and 73: Table 4.17 Simulation results (Cont
- Page 74 and 75: 4.5.3 Foundation Table (4.20) shows
- Page 76 and 77: 4.5.7 Ground beam Table (4.24) show
- Page 78 and 79: 4.5.11 Column first floor Table (4.
- Page 80 and 81: 4.6 Identify the Cause of Waste Tab
- Page 82 and 83: Percent of value adding time 35% 30
- Page 84 and 85: Table 4.33 Total project duration N
- Page 86 and 87: Then, the processes with the greate
- Page 88 and 89: number of workers to 12 workers sho
- Page 90 and 91: Activity Process Ground floor Colum
- Page 92 and 93: Actual project duration was 6000 ho
- Page 94 and 95: Date Process Assigned Process Compl
- Page 96 and 97: 5.1 Conclusion Chapter Five Conclus
- Page 98 and 99: References 1. Abudallah Fawaz , (20
- Page 100 and 101: 27. Graham, P. and Smithers, G., (1
- Page 102 and 103: 51. Serpell, A.; Venturi, A. and Co
- Page 104 and 105: Appendices (A) Daily report Date Ac
- Page 106 and 107: 04/09/2003 06/09/2003 07/09/2003 08
- Page 108 and 109: 18/12/2003 20/12/2003 21/12/2003 22
- Page 110 and 111: 11/04/2004 12/04/2004 13/04/2004 14
- Page 112 and 113: Appendix (B) Arena Simulation Compu
- Page 114: Appendix (C ) Simulation result of