A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
No.<br />
9<br />
10<br />
11<br />
Table 4.14 Non-value added processes <strong>in</strong> first floor slab (cont.)<br />
Process<br />
Mechanical work for part<br />
C<br />
Cast slab for part C<br />
Remove form work for<br />
part A,B,C<br />
Total<br />
4.4.13 Ground floor build<strong>in</strong>g<br />
Step<br />
number<br />
9<br />
10<br />
11<br />
11<br />
Step Duration<br />
Value added<br />
steps<br />
36%<br />
1/2<br />
1/2<br />
0<br />
4<br />
1day=<br />
8hour<br />
Table (4.15) shows eighteen processes where the number <strong>of</strong> value added steps is 5 out<br />
<strong>of</strong> 18 steps (27%) and the total duration <strong>of</strong> the ground floor build<strong>in</strong>g <strong>in</strong> the daily report<br />
is 560 hours<br />
Percentage <strong>of</strong> value added steps<br />
Table 4.15 Non-value added and value added processes <strong>in</strong> build<strong>in</strong>g for ground floor<br />
No.<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
Steps<br />
Build<strong>in</strong>g work <strong>in</strong> part A,B for first layer<br />
L<strong>in</strong>tel form work under the w<strong>in</strong>dows<br />
Cast l<strong>in</strong>tel<br />
Remove form work<br />
Build<strong>in</strong>g work for part A,B <strong>in</strong> the second<br />
layer<br />
L<strong>in</strong>tel form work up the w<strong>in</strong>dows<br />
Cast l<strong>in</strong>tel for second layer<br />
Remove form work<br />
Build<strong>in</strong>g work up the w<strong>in</strong>dow<br />
Build<strong>in</strong>g work <strong>in</strong> part C for first layer<br />
L<strong>in</strong>tel form work under the w<strong>in</strong>dows<br />
cast l<strong>in</strong>tel<br />
Remove form work<br />
Build<strong>in</strong>g work for part C <strong>in</strong> the second layer<br />
L<strong>in</strong>tel form work up the w<strong>in</strong>dows<br />
Cast l<strong>in</strong>tel for second layer<br />
Remove form work<br />
Build<strong>in</strong>g work up the w<strong>in</strong>dow<br />
Total<br />
Percentage <strong>of</strong> value added steps<br />
50<br />
Step<br />
number<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
18<br />
Step<br />
27%<br />
Value<br />
added<br />
steps<br />
1/2<br />
0<br />
1/2<br />
0<br />
1/2<br />
0<br />
1/2<br />
0<br />
1/2<br />
1/2<br />
0<br />
1/2<br />
0<br />
1/2<br />
0<br />
1/2<br />
0<br />
1/2<br />
5<br />
8<br />
6<br />
24<br />
163<br />
Duration<br />
(hours)<br />
56<br />
24<br />
6<br />
16<br />
72<br />
24<br />
8<br />
8<br />
48<br />
8<br />
48<br />
8<br />
80<br />
56<br />
16<br />
76<br />
24<br />
38<br />
560