Percent <strong>of</strong> non value added<br />

process<br />

35<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

0<br />

Design error Work error Lack <strong>of</strong><br />

experience<br />

Lack <strong>of</strong> number<br />

<strong>of</strong> ressources<br />

Cause <strong>of</strong> non value added process<br />

Figure 4.10 Cause <strong>of</strong> failure<br />

4.7 F<strong>in</strong>d<strong>in</strong>g the Largest Non-Value Added Process<br />

Lack <strong>of</strong><br />

material<br />

The eight po<strong>in</strong>ts that were mentioned <strong>in</strong> the methodology (4.3) were applied us<strong>in</strong>g arena<br />

simulation <strong>in</strong> order to f<strong>in</strong>d the biggest non value added process. The whole non value<br />

added process is shown <strong>in</strong> Table (4.33) by putt<strong>in</strong>g “0” non value added process <strong>in</strong> turn<br />

and calculat<strong>in</strong>g the time period <strong>in</strong> the end <strong>of</strong> the project (run the simulation Figure<br />

(4.11)).<br />

TNOW<br />

Create 2<br />

MOBILIZATION<br />

0<br />

PLAIN CONCRETE FOUNDATION NICK COLUMN ISOLATION DEMOLITION<br />

GROUND BEAM COLUMN1 GROUND FLOOR Slab work<br />

build<strong>in</strong>g work1 build<strong>in</strong>g work2 Dispose 2<br />

Figure 4.11 Simulation model<br />

69<br />

0<br />

Column2 SLAB2