4.5.11 Column first floor<br />

Table (4.28) shows that column first floor duration is equal to 195.75 hours. Before<br />

apply<strong>in</strong>g lean tools was 346 hours, and the percent <strong>of</strong> value added time 9%, the actual<br />

duration was 4.7%, and value added step percent is 50 %.It was 10 % before apply<strong>in</strong>g<br />

lean tools.<br />

No.<br />

Table 4.28 Waste elim<strong>in</strong>ation <strong>in</strong> first floor column<br />

Process<br />

1 Steel work<br />

2 Form work column<br />

3 Cast column<br />

4 Remove form work<br />

Total<br />

Percentage <strong>of</strong> value added<br />

Step<br />

number<br />

1<br />

2<br />

3<br />

4<br />

4<br />

Step<br />

Value<br />

added step<br />

Duration<br />

(hours)<br />

Duration<br />

1 16.56<br />

- 157.51<br />

1 1.27<br />

- 20.41<br />

2 195.75<br />

50% 9%<br />

Value<br />

added<br />

time (hours)<br />

16.56<br />

0<br />

1.27<br />

0<br />

17.83<br />

4.5.12 First floor slab<br />

Table (4.29) shows that slab first floor duration is equal to 140.53 hours. Before<br />

apply<strong>in</strong>g lean tools was 168 hours, and the percent <strong>of</strong> value added time 50%, the actual<br />

duration was 44%, and value added step percent is 67 %. It was 41% before apply<strong>in</strong>g<br />

lean tools.<br />

No.<br />

Table 4.29 Waste elim<strong>in</strong>ation for first floor slab<br />

Process<br />

1 Form work<br />

2 Hollow cement block<br />

3 Steel work<br />

4 Electric, mechanic<br />

work<br />

5 Cast concrete<br />

6 Remove form work<br />

Total<br />

Percentage <strong>of</strong> value added<br />

Step<br />

number<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

6<br />

64<br />

Step<br />

Value<br />

added step<br />

67%<br />

0<br />

1<br />

1<br />

1<br />

1<br />

0<br />

4<br />

Duration<br />

31.51<br />

20.32<br />

32.23<br />

8.92<br />

8.9<br />

39.37<br />

140.53<br />

Duration<br />

Value<br />

Added<br />

Time (hrs)<br />

0<br />

20.32<br />

32.23<br />

8.92<br />

8.9<br />

0<br />

70.37<br />

50%