A Study of Lean Construction Practices in Gaza Strip

A Study of Lean Construction Practices in Gaza Strip

A Study of Lean Construction Practices in Gaza Strip

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 4.10 Non-value added and value added processes for ground floor column (cont.)<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

Cast column part C.<br />

Check column part A<br />

Cast column part A<br />

Remove form work part A, C<br />

Steel work for column part B<br />

Form work column part B<br />

Check column part B<br />

Cast column part B<br />

Remove form work part B<br />

Remove 7 column(error work<br />

Steel work part B for the seven column<br />

Form work part B for the seven column<br />

Check<strong>in</strong>g the column<br />

Cast column<br />

Remove form work<br />

Total<br />

Percentage <strong>of</strong> value added steps<br />

4.4.9 Ground floor<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

18<br />

10%<br />

Table (4.11) shows seven processes where the number <strong>of</strong> value added steps is 3 out <strong>of</strong> 7<br />

steps (43 %) and the total duration <strong>in</strong> the daily report is 64 hours.<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

1/3<br />

0<br />

1/3<br />

0<br />

1/2<br />

0<br />

0<br />

1/3<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

2<br />

Table 4.11 Non-value added and value added processes for ground floor<br />

Process<br />

Mechanic work for part A,B,C<br />

Preparation work for part A,B<br />

Steel work for part A,B<br />

Cast ground floor for part A,B<br />

Preparation work for part C<br />

Steel work for part C<br />

Cast ground floor for part C<br />

Total<br />

Percentage <strong>of</strong> value added steps<br />

47<br />

Step<br />

number<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

7<br />

Steps<br />

43%<br />

Value<br />

added<br />

steps<br />

1<br />

0<br />

1/2<br />

1/2<br />

0<br />

1/2<br />

1/2<br />

3<br />

Duration<br />

(hours)<br />

1days=<br />

8hours<br />

8<br />

4<br />

12<br />

8<br />

16<br />

8<br />

8<br />

64<br />

8<br />

8<br />

8<br />

8<br />

12<br />

24<br />

8<br />

8<br />

16<br />

38<br />

8<br />

16<br />

8<br />

8<br />

36<br />

346