4.4.1 Mobilization and excavation<br />
Table (4.3) shows seven processes where the number <strong>of</strong> value added steps is 1 out <strong>of</strong> 7<br />
steps which corresponds to14% <strong>of</strong> total steps. The total duration <strong>of</strong> the mobilization and<br />
excavation <strong>in</strong> the daily report is 240 hours.<br />
No.<br />
Table 4.3 Value and non-value added processes <strong>in</strong> mobilization and excavation<br />
Process<br />
Step<br />
number<br />
Step<br />
Value<br />
added<br />
steps<br />
Duration<br />
1day=<br />
8hours<br />
1 Site clean<strong>in</strong>g, <strong>in</strong>cludes remov<strong>in</strong>g trees 1 0 48<br />
2 Demolish<strong>in</strong>g the exist<strong>in</strong>g wall<strong>in</strong>g fence. 2 0 32<br />
3 To setup the site eng<strong>in</strong>eer <strong>of</strong>fice 3 0 32<br />
4<br />
Excavation <strong>of</strong> the natural ground to the<br />
required levels<br />
4 1/2 96<br />
5 Laboratory 5 0 8<br />
6 Expand the excavation 6 1/2 16<br />
7 Laboratory 7 0 8<br />
Total 7 1<br />
Percentage <strong>of</strong> value added steps 14%<br />
240<br />
4.4.2 Pla<strong>in</strong> concrete<br />
Table (4.4) shows the five processes that constitute the pla<strong>in</strong> concrete. The number <strong>of</strong><br />
value added steps is 1 out <strong>of</strong> 5 steps (20%) and the total duration <strong>in</strong> the daily report is 63<br />
hours.<br />
Table 4.4 Non-value added and value added processes <strong>in</strong> pla<strong>in</strong> concrete<br />
No.<br />
1<br />
2<br />
3<br />
4<br />
5<br />
Process<br />
Step<br />
number<br />
Steps<br />
Value<br />
added<br />
steps<br />
0<br />
1/2<br />
0<br />
1/2<br />
Cheblona work +form work concrete 1<br />
Cast <strong>in</strong> site 10cm thick pla<strong>in</strong> concrete 2<br />
Rework form work for foundation concrete 3<br />
Cast 3M3 pla<strong>in</strong> concrete 4<br />
Remove form work 5 0<br />
Total 5 1<br />
Percentage <strong>of</strong> value added steps 20%<br />
42<br />
Duration<br />
(hours)<br />
1day=<br />
8hours<br />
24<br />
16<br />
8<br />
5<br />
10<br />
63