4.4.3. Foundation<br />
Table (4.5) shows thirteen processes that constitute the foundation. Where the number<br />
<strong>of</strong> value added steps is 2 out <strong>of</strong> 13 steps (15%) and the total duration <strong>in</strong> the daily report<br />
is 276 hours.<br />
No.<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
Table 4.5 Non-value added and value added processes <strong>in</strong> foundation<br />
Process<br />
Form work foundation concrete part "C"<br />
Form work foundation concrete part "A and<br />
"B"<br />
Fix steel <strong>of</strong> neck column part "A"<br />
Fix neck steel <strong>of</strong> neck column "B"<br />
Cast foundation "A"<br />
Remove form work part "A"+ form work<br />
part "C".<br />
Fix steel neck column part "C"<br />
Cast foundation part "B"<br />
Steel work for foundation part "C"<br />
Cast foundation part "B"<br />
Remove form work part "C"+ part "B".<br />
Form work for 5 foundation part "c", back<br />
fill<strong>in</strong>g<br />
Steel work +cast 5 foundation part "C" +<br />
back fill<strong>in</strong>g + steel work + Laboratory<br />
Total<br />
Percentage <strong>of</strong> value added steps<br />
43<br />
Step<br />
number<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
13<br />
Step<br />
15%<br />
Value<br />
added<br />
steps<br />
0<br />
0<br />
1/4<br />
1/4<br />
1/4<br />
0<br />
1/4<br />
1/4<br />
1/4<br />
1/4<br />
0<br />
0<br />
1/4<br />
2<br />
Duration/<br />
hours<br />
1day=8hou<br />
rs<br />
88<br />
80<br />
28<br />
8<br />
8<br />
8<br />
4<br />
4<br />
8<br />
8<br />
8<br />
16<br />
8<br />
276