- Page 15 and 16: Chapter One Introduction Lean produ
- Page 17 and 18: details. Chapter Four analyzes case
- Page 19 and 20: The lean movement in construction s
- Page 21 and 22: 2.4.3 Flow The third principle is f
- Page 23 and 24: 2.5 Criteria of Lean Construction K
- Page 25 and 26: Figure (2.1) shows that the cycle t
- Page 27 and 28: organizations, process owners for c
- Page 29 and 30: � Gaining superiority by combinin
- Page 31 and 32: is to produce a plan for the integr
- Page 33 and 34: the lean manufacturing tool, Visual
- Page 35 and 36: Table 2.2 5S Purpose and Goals (con
- Page 37 and 38: • Those who design buildings, •
- Page 39 and 40: 2.8 Construction Waste in the Gaza
- Page 41 and 42: 3. Poor storage 4. Far distance bet
- Page 43 and 44: 2.9 Summary The lean construction t
- Page 45 and 46: Chapter Three Methodology This chap
- Page 47 and 48: Main Activity Building work 3.2.2 S
- Page 49 and 50: Chapter Four Application Lean has b
- Page 51 and 52: Setting the process durations of th
- Page 53 and 54:
Main Activity Back filling Ground b
- Page 55 and 56:
4.4. Non-Value Added and Value Adde
- Page 57 and 58:
4.4.3. Foundation Table (4.5) shows
- Page 59 and 60:
4.4.5 Isolation Table (4.7) shows t
- Page 61 and 62:
Table 4.10 Non-value added and valu
- Page 63 and 64:
No. Table 4.13 Non-value added proc
- Page 65 and 66:
4.4.14 First floor building Table (
- Page 67 and 68:
Excavation data according to Table
- Page 69 and 70:
The cast concrete data according to
- Page 71 and 72:
Table 4.17 Simulation results (Cont
- Page 73 and 74:
4.5.1 Mobilization and excavation T
- Page 75 and 76:
4.5.5 Isolation Table (4.22) shows
- Page 77 and 78:
4.5.9 Ground floor Table (4.26) sho
- Page 79 and 80:
4.5.13 Building in ground floor Tab
- Page 81 and 82:
Figure (4.9) is divided into four q
- Page 83 and 84:
Percent of non value added process
- Page 85 and 86:
Then the candidates have been sorte
- Page 87 and 88:
Finally, buffers are introduced to
- Page 89 and 90:
Activity Process Isolation Isolatio
- Page 91 and 92:
Activity Process Column work first
- Page 93 and 94:
4.8 Application of Lean Constructio
- Page 95 and 96:
Figure (4.15) shows the average of
- Page 97 and 98:
5.2 Recommendations In order to app
- Page 99 and 100:
13. Ballard, G., and Howell, G.,( 2
- Page 101 and 102:
37. Monden, Yasuhiro (1998) "Toyota
- Page 103 and 104:
Appendix A Daily Report. Appendix B
- Page 105 and 106:
Date 24/07/2003 26/07/2003 27/07/20
- Page 107 and 108:
28/10/2003 30/10/2003 01/11/2003 02
- Page 109 and 110:
26/02/2004 Slab A C and Building wo
- Page 111 and 112:
12/07/2004 Building first floor 13/
- Page 113 and 114:
Table B1: The basic elements of are
- Page 121:
Non value added time processes D4