A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 4.28: Waste elim<strong>in</strong>ation for F.Floor column ....................................................... 64<br />
Table 4.29: Waste elim<strong>in</strong>ation for F.Floor Slab ............................................................. 64<br />
Table 4.30: Waste elim<strong>in</strong>ation processes for build<strong>in</strong>g for G.Floor ................................ 65<br />
Table 4.31: Waste elim<strong>in</strong>ation <strong>in</strong> build<strong>in</strong>g for F.Floor................................................... 65<br />
Table 4.31: Difference between activity before and after apply<strong>in</strong>g lean........................ 66<br />
Table 4.33: Total project duration ................................................................................ 70<br />
Table 4.34: Activities <strong>in</strong> a descend<strong>in</strong>g order based on duration..................................... 71<br />
Table 4.35: Greatest duration <strong>of</strong> waste <strong>in</strong> activity.......................................................... 72<br />
Table 4.36: Project duration without the most wast<strong>in</strong>g activity .................................... .72<br />
Table 4.37: Balanc<strong>in</strong>g the process .................................................................................. 74<br />
Table 4.38: Cycle time compared................................................................................... 78<br />
Table 4.39: Process assigned and process completed..................................................... 80<br />
XI