4.5.1 Mobilization and excavation<br />

Table (4.18) shows that mobilization and excavation duration is equal to 151.35 hours.<br />

Before apply<strong>in</strong>g lean tools, it was 240 hours, and the percentage <strong>of</strong> value added time<br />

was 63%, the actual percent value added duration was 39%, and value added steps after<br />

apply<strong>in</strong>g the five why tools is 33% (before apply<strong>in</strong>g lean tools was 14%). Step1 and 3<br />

are merged.<br />

No. Process<br />

1<br />

2<br />

Table 4.18 Waste elim<strong>in</strong>ation <strong>in</strong> mobilization<br />

Site clean<strong>in</strong>g, <strong>in</strong>cludes remov<strong>in</strong>g<br />

trees<br />

Demolish<strong>in</strong>g the exist<strong>in</strong>g wall<strong>in</strong>g<br />

fence, rooms and any obstructed<br />

item exist<strong>in</strong>g <strong>in</strong> the proposed area<br />

Step<br />

number<br />

1<br />

Step<br />

Value<br />

added<br />

steps<br />

0<br />

Duration<br />

<strong>of</strong> process<br />

(hours)<br />

48<br />

Duration<br />

Value<br />

added<br />

time<br />

(hours)<br />

3<br />

Excavation <strong>of</strong> the natural ground<br />

to the required levels<br />

2 1 95.29 95.29<br />

4 Laboratory 3 0 8.06 0<br />

Total 3 1 151.35 95.29<br />

Percentage <strong>of</strong> value added<br />

33% 63%<br />

4.5.2 Pla<strong>in</strong> concrete<br />

Table (4.19) shows that pla<strong>in</strong> concrete duration is equal to 41.09 hours. Before apply<strong>in</strong>g<br />

lean tools, it was 63 hours, and the percent <strong>of</strong> value added time 9%, the actual duration<br />

was 6%, and value added step percent is 33%. It was 20% before apply<strong>in</strong>g lean tools.<br />

No.<br />

Table 4.19 Waste elim<strong>in</strong>ation <strong>in</strong> pla<strong>in</strong> concrete<br />

Process<br />

1 formwork concrete for<br />

"A-B"<br />

2 Cast pla<strong>in</strong> concrete<br />

3 Remove form work<br />

Total<br />

Percentage <strong>of</strong> value added<br />

Step<br />

number<br />

Step<br />

Value<br />

added steps<br />

0<br />

1<br />

2 1<br />

3 0<br />

3 1<br />

33%<br />

59<br />

Duration<br />

<strong>of</strong> process<br />

(hours)<br />

34.83<br />

3.97<br />

5.037<br />

43.83<br />

Duration<br />

9%<br />

0<br />

Value<br />

added<br />

time<br />

(hours)<br />

0<br />

3.97<br />

0<br />

3.97