A Study of Lean Construction Practices in Gaza Strip

A Study of Lean Construction Practices in Gaza Strip

A Study of Lean Construction Practices in Gaza Strip

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.5.9 Ground floor<br />

Table (4.26) shows that ground floor duration is equal to 47.56 hours. Before apply<strong>in</strong>g<br />

lean tools was 64 hours, and the percent <strong>of</strong> value added time 77%, the actual duration<br />

was 55%, and value added step percent is 75 %. It was 57% before apply<strong>in</strong>g lean tools.<br />

No.<br />

Table 4.26 Waste elim<strong>in</strong>ation for ground floor<br />

Process<br />

1 Preparation work<br />

2 Steel work<br />

3 Mechanical work<br />

4 Cast concrete<br />

Total<br />

Percentage <strong>of</strong> value<br />

added<br />

Step<br />

number<br />

1<br />

2<br />

3<br />

4<br />

4<br />

Step<br />

75%<br />

Value<br />

added<br />

step<br />

0<br />

1<br />

1<br />

1<br />

3<br />

Duration<br />

10.99<br />

27.03<br />

4.95<br />

4.59<br />

47.56<br />

Duration<br />

77%<br />

Value<br />

added<br />

time<br />

0<br />

27.03<br />

4.95<br />

4.59<br />

36.57<br />

4.5.10 Ground floor slab<br />

Table (4.27) shows that slab ground floor duration is equal to 142.83 hours. Before<br />

apply<strong>in</strong>g lean tools was 168 hours, and the percent <strong>of</strong> value added time 49% the actual<br />

duration was 41%, and value added step percent is 67 %. It was 44% before apply<strong>in</strong>g<br />

lean tools.<br />

No.<br />

Table 4.27 Waste elim<strong>in</strong>ation for ground floor slab<br />

Process<br />

1 Form work<br />

2 Hollow cement block<br />

3 Steel work<br />

Electric + mechanic<br />

4<br />

work<br />

5 Cast concrete<br />

6 Remove form work<br />

Total<br />

Percentage <strong>of</strong> value added<br />

Step<br />

number<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

6<br />

63<br />

Step<br />

67%<br />

Value<br />

added step<br />

0<br />

1<br />

1<br />

1<br />

1<br />

0<br />

4<br />

Duration<br />

31.58<br />

19.85<br />

32.86<br />

8.69<br />

Duration<br />

Value<br />

added<br />

time<br />

0<br />

19.85<br />

32.86<br />

8.69<br />

8.98 8.98<br />

40.87 0<br />

142.83 70.38<br />

49%