Table 4.17 Simulation results (Cont.)<br />
No. Activity Process<br />
7 Ground Beam<br />
8 Ground Floor<br />
9<br />
Column Work<br />
10 Slab Work<br />
11 Build<strong>in</strong>g Work<br />
.<br />
V.A.Time<br />
(hours)<br />
N.V.A.Time<br />
(hours)<br />
Form work 0 56.85<br />
Cast<strong>in</strong>g 4.19<br />
Remove form work 0 25.58<br />
Steel work 14 0<br />
Installation P.V.C 6.21 0<br />
Electrical work 11.76 0<br />
Cast<strong>in</strong>g 4.95 0<br />
Mechanical work 4.95 0<br />
Preparation 0 10.99<br />
Steel work 27.03 0<br />
Steel work 15.87 0<br />
Cast<strong>in</strong>g 1.23 0<br />
Form work 0 163.82<br />
Remove form work 0 19.68<br />
Cast<strong>in</strong>g 8.98 0<br />
Electrical Work 8.69 0<br />
Form work 0 31.58<br />
Hollow cement 19.85 0<br />
Remove form work 0 40.87<br />
Steel work 32.86 0<br />
Build<strong>in</strong>g 1 173.29 0<br />
Build<strong>in</strong>g 2 133.24 0<br />
Build<strong>in</strong>g 3 173.69 0<br />
Form work 1 0 19.62<br />
Form work 2 0 19.72<br />
Cast1 5.87 0<br />
Cast2 5.98 0<br />
Remove 1 0 11.72<br />
Remove2 0 11.88<br />