The cast concrete data accord<strong>in</strong>g to Table (3.1) is found <strong>in</strong> Figure (4.7). This process is<br />
value added. The duration was 3.5 hours m<strong>in</strong>imum, 4 hours most likely, 4.5 hours<br />
maximum. Average duration for 30 replication was 3.97 hours.<br />
Figure 4.7 Cast<strong>in</strong>g pla<strong>in</strong> concrete process data<br />
Data <strong>of</strong> formwork removal process <strong>in</strong> Table (4.2) is <strong>in</strong>putted <strong>in</strong> Figure (4.8). This is a<br />
non-value added process. The average duration <strong>of</strong> 30 replications was 5.03 hours.<br />
Figure 4.8 Remove formwork process data<br />