A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
No.<br />
Table 4.13 Non-value added processes <strong>in</strong> first floor column<br />
Process<br />
1 Steel work column part A,C<br />
2 Form work column part A,C<br />
Check column before cast<strong>in</strong>g<br />
3<br />
for part C<br />
4 Cast column part C<br />
5 Check column part A.<br />
6 Cast column part A<br />
7 Remove form work part A, C<br />
8 Steel work for column part B<br />
9 Form work column part B<br />
10 Check column part B<br />
11 Cast column part B<br />
12 Remove form work part B<br />
Total<br />
Percentage <strong>of</strong> value added steps (%)<br />
4.4.12 First floor slab<br />
Step<br />
number<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
12<br />
Step<br />
16%<br />
Value added<br />
steps<br />
1/2<br />
0<br />
0<br />
1/3<br />
0<br />
1/3<br />
0<br />
1/2<br />
0<br />
0<br />
1/3<br />
0<br />
2<br />
Duration/<br />
hours<br />
1day=<br />
8hours<br />
The eleven processes that represent first floor slab are shown <strong>in</strong> Table (4.14). The<br />
number <strong>of</strong> value added steps is 4 out <strong>of</strong> 11 steps (36%) and the total duration <strong>in</strong> the<br />
daily report is 163 hours.<br />
No.<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
Table 4.14 Non-value added processes <strong>in</strong> first floor slab<br />
Process<br />
Step<br />
number<br />
Step<br />
Value added<br />
steps<br />
Duration<br />
1day=<br />
8hour<br />
Form work for part A,B 1<br />
0<br />
50<br />
Hollow cement block for<br />
part A,B<br />
2 1/2<br />
5<br />
Electric work for part<br />
A,B<br />
3 1/2<br />
4<br />
Mechanical work for part<br />
A,B<br />
4 1/2<br />
6<br />
Cast slab ground floor<br />
part A,B<br />
5<br />
1/2<br />
6<br />
Form work fort part C 6<br />
0<br />
34<br />
Hollow cement bloc for<br />
part C<br />
7<br />
1/2<br />
16<br />
Electric work for part C 8 1/2<br />
4<br />
49<br />
32<br />
88<br />
8<br />
7<br />
12<br />
6<br />
12<br />
14<br />
72<br />
6<br />
6<br />
37<br />
300