A Study of Lean Construction Practices in Gaza Strip

A Study of Lean Construction Practices in Gaza Strip

A Study of Lean Construction Practices in Gaza Strip

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No.<br />

Table 4.13 Non-value added processes <strong>in</strong> first floor column<br />

Process<br />

1 Steel work column part A,C<br />

2 Form work column part A,C<br />

Check column before cast<strong>in</strong>g<br />

3<br />

for part C<br />

4 Cast column part C<br />

5 Check column part A.<br />

6 Cast column part A<br />

7 Remove form work part A, C<br />

8 Steel work for column part B<br />

9 Form work column part B<br />

10 Check column part B<br />

11 Cast column part B<br />

12 Remove form work part B<br />

Total<br />

Percentage <strong>of</strong> value added steps (%)<br />

4.4.12 First floor slab<br />

Step<br />

number<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

12<br />

Step<br />

16%<br />

Value added<br />

steps<br />

1/2<br />

0<br />

0<br />

1/3<br />

0<br />

1/3<br />

0<br />

1/2<br />

0<br />

0<br />

1/3<br />

0<br />

2<br />

Duration/<br />

hours<br />

1day=<br />

8hours<br />

The eleven processes that represent first floor slab are shown <strong>in</strong> Table (4.14). The<br />

number <strong>of</strong> value added steps is 4 out <strong>of</strong> 11 steps (36%) and the total duration <strong>in</strong> the<br />

daily report is 163 hours.<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Table 4.14 Non-value added processes <strong>in</strong> first floor slab<br />

Process<br />

Step<br />

number<br />

Step<br />

Value added<br />

steps<br />

Duration<br />

1day=<br />

8hour<br />

Form work for part A,B 1<br />

0<br />

50<br />

Hollow cement block for<br />

part A,B<br />

2 1/2<br />

5<br />

Electric work for part<br />

A,B<br />

3 1/2<br />

4<br />

Mechanical work for part<br />

A,B<br />

4 1/2<br />

6<br />

Cast slab ground floor<br />

part A,B<br />

5<br />

1/2<br />

6<br />

Form work fort part C 6<br />

0<br />

34<br />

Hollow cement bloc for<br />

part C<br />

7<br />

1/2<br />

16<br />

Electric work for part C 8 1/2<br />

4<br />

49<br />

32<br />

88<br />

8<br />

7<br />

12<br />

6<br />

12<br />

14<br />

72<br />

6<br />

6<br />

37<br />

300