4.4.5 Isolation<br />
Table (4.7) shows two processes that constitute the isolation. The number <strong>of</strong> value<br />
added steps is 1 out <strong>of</strong> 2 steps (50 %) and the total duration <strong>in</strong> the daily report is 48<br />
hours.<br />
No.<br />
1<br />
Table 4.7 Non-value added and value added processes <strong>in</strong> isolation processes<br />
Clean<strong>in</strong>g<br />
Process<br />
2 Clean<strong>in</strong>g , isolation work<br />
Total<br />
Percentage <strong>of</strong> value added steps<br />
4.4.6 Back fill<strong>in</strong>g<br />
Step<br />
number<br />
1<br />
2<br />
2<br />
Steps<br />
50%<br />
Value<br />
added<br />
steps<br />
0<br />
1<br />
1<br />
Duration (hours)<br />
1day=8hours<br />
The six processes that represent backfill<strong>in</strong>g are shown <strong>in</strong> Table (4.8). The number <strong>of</strong><br />
value added steps is three out <strong>of</strong> six steps (50%) and the total duration <strong>in</strong> the daily report<br />
is 112 hours.<br />
Table 4.8 Non-value added and value added processes <strong>in</strong> back fill<strong>in</strong>g<br />
No.<br />
1<br />
2<br />
3<br />
Process<br />
Back fill<strong>in</strong>g layer1 + clean<strong>in</strong>g<br />
Laboratory<br />
Back fill<strong>in</strong>g layer 2<br />
4 Laboratory<br />
5 Back fill<strong>in</strong>g layer 3<br />
6 Laboratory<br />
Total<br />
Percentage <strong>of</strong> value added steps<br />
Step<br />
number<br />
45<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
6<br />
Step<br />
50%<br />
Value<br />
added<br />
steps<br />
1<br />
0<br />
1<br />
0<br />
1<br />
0<br />
3<br />
8<br />
40<br />
48<br />
Duration<br />
1day=8hours<br />
Duration<br />
Of process/<br />
hours<br />
48<br />
8<br />
32<br />
4<br />
16<br />
4<br />
112